Zahle Wastewater Treatment Plant

Wastewater treatment, Treats around 20,000 m3/day in Lebanon.

Operational

The record

Country
Lebanon
Location
Zahle
Coordinates
33.794, 35.914
Technology
Wastewater treatment
Capacity
Treats around 20,000 m3/day
Capital cost
EUR 29 m (Italian loan of EUR 22 m and EUR 7 m from the Government of Lebanon), converted at EUR 0.89 per US$ (World Bank official exchange rate, euro area, 2017 average, the year the plant was completed; the loan is dated 2000 by UNDP and 2005 by the National News Agency, so no loan-year rate is used); reuse planned, not built
Stage
Operational
Owner or client
Council for Development and Reconstruction
Contractor
SUEZ Environment (build-operate-transfer)
Operator
UNDP-contracted operator since September 2022
Finance
Italian Agency for Development Cooperation loan of EUR 22 million with EUR 7 million from the Government of Lebanon; operation funded from 2022 by an Italian grant of EUR 4 million channelled through UNDP
Award or start year
—
Commissioned
2017-10

Record last checked 2026-10-16.

History

Sources

11 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Karim Eid-Sabbagh, Wastewater Reuse in Lebanon: Shedding Light on Hydro-Social Politics at Multiple Scales, Water Alternatives 16(2): 606-631 (2023). water-alternatives.org.
  2. The plant treats around 20,000 m3/day of high-quality water lost to the polluted Litani; it was financed with a EUR 22 million loan from the Italian Agency for Development Cooperation plus EUR 7 million from the Lebanese government; the CDR implemented the funds through a BOT contract awarded to SUEZ Environment with operation fees of EUR 2 million a year, supervised by the consulting company Rafiq Khoury; in 2020 the Bekaa Water Establishment stated it could not operate the built and equipped Iaat, Joub Jannine and Zahle plants to required standards.
  3. The961, Italy signed a $4.2 million loan for the wastewater treatment plant in Zahle (27 Jun 2022). the961.com.
  4. EUR 4 million from Italy over two years, managed by UNDP, covering sludge treatment.
  5. World Bank, Aide-Memoire, Implementation Support Mission 5-16 May 2025 for the Lake Qaraoun Pollution Prevention Project. documents1.worldbank.org.
  6. The remaining 38 km of sewer network in Zahle was due for completion by November 2025, a solar sludge dryer design by November 2025, and handover of all sewer network to the Bekaa Water Establishment by December 2025. Budget left blank: the euro figures carry no conversion rate or date.
  7. Coordinates from OpenStreetMap.
  8. UNDP Lebanon, Operation of Zahle wastewater treatment facility (project page). undp.org.
  9. In 2000 the Italian Government granted Lebanon a soft loan (AID/05/008/00) for the plant; construction completed in October 2017. National News Agency, 24 June 2022. nna-leb.gov.lb.
  10. The project was originally financed in 2005 by the Italian Government with a EUR 22 million soft loan; construction awarded by the CDR to Suez Trattamento Acque; operation and maintenance from 2 October 2017. CDR, Progress Report, October 2012, wastewater, p. 139. pseau.org.
  11. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

The plant still being executed, US$24 million funded through the Italian Protocol, 50% executed. The contract award year is not stated in these sources (before October 2012), so the award or start year is left blank; the earlier 2022 entry was the year UNDP-managed operation began.