Jordan has about 82 cubic metres of total renewable water per person a year, far below the 500 m³ line of absolute scarcity.1 Most of its water is pumped from aquifers at rates well beyond their safe yield.2 Several of its main sources, the Yarmouk, the Jordan River and the Disi aquifer, are shared with Syria, Israel and Saudi Arabia (see Shared waters). Jordan’s national response is a desalination plant at Aqaba, with a conveyor to Amman, planned to deliver first water around the end of the decade.3 4

In Jordan, water has long had to be caught, stored and moved. At Petra, the NabataeansNabataeans The people whose rock-cut capital city was Petra, between the Red Sea and the Dead Sea. In Hellenistic and Roman times Petra became a major caravan centre for the incense of Arabia, the silks of China and the spices of India. Source: Petra, UNESCO World Heritage Centre settled an essentially arid area by engineering its water.5 In the first centuries BC and AD, channels, tunnels and diversion dams fed a large network of cisterns and reservoirs that held and conserved the seasonal rains.5 Intensive irrigation began in 1958, when Jordan started diverting the Yarmouk into the East Ghor Canal, later renamed the King Abdullah Canal.6 Today, most of Amman’s drinking water is pumped uphill from sources up to 325 km away (see Infrastructure).7

Moving water has not made more of it. Demand keeps rising: successive waves of refugees have accelerated population growth, while economic development and pressure to expand agricultural areas add to demand.8 Water is increasingly diverted from the Jordan Valley’s agricultural area to supply Amman,9 and groundwater levels are declining because of over-exploitation.7 Much of the water supplied also earns no revenue: in August 2026, the water minister put national non-revenue waterNon-revenue water The difference between the amount of water put into a distribution system and the amount billed to consumers. High levels reflect water lost through leaks, water not invoiced to customers, or both. Source: The Challenge of Reducing Non-Revenue Water in Developing Countries (Kingdom, Liemberger and Marin), World Bank, 2006 at 41%.10

61
cubic metres of renewable fresh water per person per year on the count of the National Water Strategy 2023–2040, among the world's lowest8

Snapshot

11.5 M11
people (2025) · -0.3% a year
1,1892
million m³ total water use a year (2024)
821
m³ total renewable water per person a year, including inflows from upstream (2023)
41%10 7
of supply lost as non-revenue water (2026; 50% in 2022)
3003
MCM/yr new desalination, early works under way (Aqaba–Amman carrier)
89.0%11
of people use safely managed drinking water (2024)

Baseline water stress12

4.62of 5
Extremely high (>80%)

Against the scarcity line

821m³ per person / year

Total renewable water per person, including inflows from upstream (2023): below the 500 m³ absolute-scarcity line. Falkenmark thresholds: water stress below 1,700, water scarcity below 1,000, absolute water scarcity below 500 m³ per person per year.13 The National Water Strategy 2023–2040 counts about 61 m³ of renewable fresh water per person.

Key institutions

  • Ministry of Water & Irrigation (MWI)Ministry
  • Water Authority of Jordan (WAJ)Water authority
  • Miyahuna (Amman)Utility
  • Yarmouk Water CompanyUtility

Financing & PPP

  • PPP frameworkActive (As-Samra BOT; Aqaba–Amman desalination PPP: Meridiam/SUEZ appointed September 2024, project agreement signed January 2025)
  • Flagship budgetUS$ 4.3 bn capital cost (Aqaba–Amman carrier, April 2026 agreement)
  • Active fundersKfW, United States (State Department and DFC), EIB, EBRD
  • Climate adaptation planSubmitted to UNFCCC (March 2025; national plan adopted 2021)

Key challenges

  1. 01Among the world's water-poorest countries (~82 m³ total renewable water per person)
  2. 02Transboundary dependence (Yarmouk, Jordan, Disi)
  3. 03Non-revenue water at 41% (2026)
  4. 04Refugee-driven demand growth

Developments to watch

  1. 01Aqaba–Amman desalination and conveyance: agreements signed April 2026, financial close pending
  2. 02Non-revenue water target of 35% once the national conveyance project operates, falling to 25% by 2040
  3. 03Treated wastewater rising from 186 million m³ (2019) to 235 million m³ by 2030, about 90% reused
  4. 04Accession to the UN Water Convention, February 2026
Sources and notes

Population: World Bank WDI, 2025.
Total water use: Ministry of Water and Irrigation, Water Budget 2024.
Total renewable water per person: FAO AQUASTAT, 2023.
Non-revenue water: Ministry of Water and Irrigation, 2026; 50% in 2022.
New desalination: EBRD, 2025.
Drinking water: WHO/UNICEF Joint Monitoring Programme (JMP), 2024 estimates, via the World Bank WDI.
Baseline water stress: WRI Aqueduct 4.0 country rankings (2023), baseline water stress, all sectors, 1979–2019: total water demand as a share of available renewable surface and groundwater supply, scored 0–5 and averaged over the country weighted by water demand.
Against the scarcity line: FAO AQUASTAT, 2023.

Sources: MWI Water Budget 2024 (total, use by sector, supply by source, desalination share); MWI Water Sector Facts & Figures 2022; FAO AQUASTAT 2021 (reuse share); National Water Strategy 2023–2040; MWI Wastewater Management and Reuse Policy (2023); National Adaptation Plan (2021); DOS Jordan; World Bank 2024.

Water map

One interactive map of Jordan's water, with switchable views built from real geodata and ordered from the natural setting to the engineered response. Climate & drought maps the aridity gradient against the published warming and drought projections. Demand shows where municipal demand is concentrated and growing. Infrastructure brings the physical system together: rivers, major dams, treatment plants, desalination, and the canals and conveyors that move water to the cities. Shared waters outlines the transboundary river basins and aquifers that Jordan shares with other countries, each drawn in full across the border; hover an outline for the countries that share it. Sources are cited under each view. Groundwater abstraction by basin is charted under Water resources.

Switch layer
Water projectDamRiverConveyance
Sources and notes

Interactive map: switch views, hover or focus a marker, and use the +/− controls (or double-click, then drag) to zoom and pan. Geometry and data from the MENA Water Review library.

Geography & climate

Jordan covers about 88,780 km², east of the Jordan River.14 The Jordan Rift Valley, about 5,000 km², runs from Lake Tiberias, 212 m below sea level, through the Jordan Valley to the Dead Sea,14 whose surface stood 441 m below sea level on 1 July 2026.15 It is the lowest valley in the world.16 East of it rise highlands of 600–1,600 m, cut by side wadis that drain to the valley.14 Beyond lies the Badia, a desert of about 69,000 km² that extends the Arabian Desert.14 The main surface basins are the Yarmouk and the Zarqa, together with the Mujib, Dead Sea, Hasa and Wadi Araba basins.14

Rainfall

Rain is scarce and falls in a short season. Over 91% of the country receives less than 200 mm a year.14 Station records range from 28 mm in the southern Badia to 570 mm at Ras Muneef in the northern highlands.16 In the Jordan Valley, rainfall drops from about 280 mm at Deir Alla to 71 mm at Ghor Safi.16 Rain-fed farming needs more than about 250 mm, which confines it to the northern and western highlands.16 The season runs from October to May. About 80% of the rain falls from December to March, peaking in January.16 The national average was 94 mm over 1937/38–2004/05, but only 80 mm in the last ten years of that period.14

In the World Bank Climate Change Knowledge Portal’s ERA5 reanalysis, averaged over the whole of Jordan, about 82 mm of rain falls in a year (1991–2020). Station records and national averages use other sources and baselines, so their figures can differ (the text cites a national average of 94 mm over 1937/38–2004/05 from FAO). About 57% of the rain falls in January, February and March, and 6 months average less than 5 mm. Average rainfall in 1993–2022 was within 3% of the 1951–1980 level, though single years swing widely.

The year in rain and heat

Monthly rainfall (bars, mm) and mean temperature (line, °C), country average 1991–2020

051015209°19°28°JanFebMarAprMayJunJulAugSepOctNovDec

Temperature and trends

Mean annual temperature ranges from 13 °C in the southern Badia to 28 °C at Aqaba, with a national mean of 18.6 °C.16 The climate is semitropical in the Rift Valley, Mediterranean in the highlands and continental in the eastern desert.14 Station records show annual rainfall falling significantly, by 1.2 mm a year, while the decline was significant in every month of the rainy season except January.16 Since the 1960s, annual maximum temperatures have risen by 0.3–1.8 °C and minimum temperatures by 0.4–2.8 °C, depending on the region.17 Annual rainfall has declined by 5–20%, depending on the region. The World Bank warns that multi-year droughts will become the new normal.17 The report gives no period for that decline, and the country-wide reanalysis average under Rainfall above, which compares 1993–2022 with 1951–1980, shows no fall of that size.

The same reanalysis gives a mean temperature of 19.4 °C for 1991–2020 and a warming of about 0.43 °C a decade over 1971–2022. Station records and national reports use other sources and periods, so their warming rates can differ.

Show

Annual rainfall, 1950 to 2022

Country average, mm

0501001502001960197019801990200020101950202272 mm

Annual mean temperature, 1950 to 2022

Country average, °C

16182022241960197019801990200020101950202220.1 °C

Projections

The third national communication projects warming by 2085 of about 2.1 °C under a moderate scenario and 4 °C under high emissions.16 Rainfall in 2070–2100 could fall by about 15% or 21% respectively, with larger declines in the west.16 The national average of summer maximum temperatures could exceed 42–44 °C, and droughts would become more frequent.16 The World Bank projects warming of up to 2.9 °C by 2050, and 30% less water per person by 2040.17

Projected change for Jordan

The table gives the CMIP6 multi-model median from the same World Bank portal, as change against 1995–2014. Projections cited in the text may use other models, scenarios or baselines, so their figures can differ.

Climate projections for Jordan
ScenarioTemperature, 2040–2059Rainfall, 2040–2059Temperature, 2080–2099Rainfall, 2080–2099
Middle of the road (SSP2-4.5)+1.8 °C−3%+2.8 °C−6%
High emissions (SSP5-8.5)+2.3 °C−4%+5.4 °C−17%
Sources and notes

Source: World Bank Climate Change Knowledge Portal, retrieved September 2026. ERA5 0.25° reanalysis for the annual series (1950–2022) and the monthly climatology (1991–2020); CMIP6 0.25° multi-model ensemble median for the projections, as change against 1995–2014. These are national averages, which hide the gap between wet highlands and dry interiors, and reanalysis rainfall over deserts carries wide uncertainty.

Water resources

A budget of about 1.2 billion cubic metres

In 2024 the Ministry of Water and Irrigation put total water use at 1,189 million cubic metres.2 The sector abbreviates the unit to MCM, and one MCM is a billion litres. Groundwater supplied about 57% of it (677 MCM), surface water about 26% (314 MCM) and treated wastewater the remaining 17% (197.5 MCM).2

Several of the large sources are shared with other countries, making water management partly a matter of diplomacy. It also means some of these water resources are affected by decisions in Syria, Israel and Saudi Arabia, not only in Jordan.

Where Jordan's water comes from (2024)

The ~1,189 MCM budget of 2024, MCM (Water Budget 2024)

  • Groundwater677.35 MCM
  • Surface water314.34 MCM
  • Treated wastewater197.5 MCM

Surface water: three stressed rivers

Surface water supplies about a quarter of the total, and the three principal rivers, the Jordan, the Yarmouk and the Zarqa, have all become unreliable. Upstream diversion and over-pumping in Syria and Israel reduce what arrives.18 The Lower Jordan’s lost flow is set out under Shared waters. The Yarmouk matters most for supply: FAO put it at around 40% of Jordanian surface water in 1997.19

The main rivers

The table ranks the rivers of Jordan by the largest natural flow they reach inside the country. Natural flow is the modelled long-term average before any withdrawals. For a heavily used river it measures what the river could carry, not what arrives today.

Main rivers of Jordan
RiverAlso flows throughLength in Jordan, kmNatural flow, m³/sFree-flowing
JordanIsrael, Palestine143570%
Wadi Mujib–120–100%
YarmoukIsrael, Syria64–0%
ZarqaSyria80–15%

The dams on these rivers, from the FAO AQUASTAT inventory, are listed river by river under Infrastructure.

Sources and notes

Sources: Grill, Lehner, Thieme et al. (2019), Mapping the world’s free-flowing rivers, Nature 569, dataset under CC BY 4.0, for length, natural flow (WaterGAP, 1971–2000) and free-flowing status, meaning the share of the river’s length inside Jordan still classed as free-flowing. No flow figure is given below 20 m³/s, where a global model is too coarse to rank small rivers. The same rivers are drawn on the water map above under Rivers & lakes. For Jordan: the Zarqa is listed as also flowing through Syria because the dataset follows its basin: the river itself rises near Amman and only its basin reaches Syria.20

Groundwater: the mainstay, over-drawn

With surface water unreliable, most of Jordan's supply comes from underground. That is around 57% of the 2024 budget,2 drawn from twelve mapped basins.7

Each basin has a safe yield: the amount that can be drawn each year and replaced by rain. For Jordan as a whole, the safe yield of renewable groundwater is estimated at about 275 MCM/yr, while total groundwater use was about 677 MCM in 2024, on the ministry’s newest water budget.2 In its 2022 figures, the ministry says that ten of the country's 12 main aquifers were being depleted beyond their recharge volumes.7 The chart breaks the imbalance down basin by basin, on the ministry’s 2022 figures, when basin abstraction totalled 656 MCM. In the worst case, Azraq, abstraction in 2022 was about 2.7 times the safe yield, and Amman–Zarqa ran the largest deficit, about 75 MCM.7 Disi is a separate case. Its water is fossil water, rain that fell tens of thousands of years ago with nothing refilling it. Pumping there is mining rather than harvesting.

Groundwater: abstraction vs safe yield, by basin (2022)

MCM per year. Where the dark bar runs well past the light one, the aquifer is being drawn down

AbstractionSafe yield MCM/yr

  • Azraq271% of safe yield65.0524
  • Jordan Side Valleys201% of safe yield30.1515
  • Amman–Zarqa186% of safe yield162.487.5
  • Araba North172% of safe yield6.023.5
  • Jordan Valley170% of safe yield35.6421
  • Dead Sea165% of safe yield93.9957
  • Araba South147% of safe yield8.15.5
  • Disi & Mudawara (fossil)143% of safe yield178.97125
  • Jafer142% of safe yield38.3927
  • Yarmouk89% of safe yield35.7540
  • Hammad17% of safe yield1.378
  • Sirhan0% of safe yield05

Water tables are falling where over-abstraction is worst. A US Geological Survey study of six major basins found levels declining by about 1 m a year on average, with salinity rising substantially in more than half of the wells in the Amman–Zarqa basin.21 The ministry puts the decline in the main aquifers at about 2 m a year.7

Sources and notes

Safe yield and abstraction by basin in 2022: Ministry of Water and Irrigation, Jordan Water Sector Facts & Figures 2022, p. 8.7 The basin safe yields add up to about 418 MCM: 275 MCM of renewable groundwater and about 143 MCM of non-renewable groundwater that the ministry allows to be drawn down over 50 years.2

Non-conventional resources

Treated wastewater accounted for around 17% of the water budget in 20242 and was the fastest-growing source over 2012 to 2022.7 Almost all of it is reused in agriculture, which frees fresh water for drinking. The ministry’s wastewater reuse policy, which implements the National Water Strategy, expects treated volumes to rise from 186 MCM in 2019 to 235 MCM by 2030 as population and treatment capacity grow.22 The schedule for building the plants is the less certain half of that forecast. Treated wastewater has become a fixed component of the water budget, with about 195 MCM reused in 2023, Noon Post reported from the ministry’s figures,23 and about 197.5 MCM in 2024 on the ministry’s Water Budget 2024.2

Water use by sector

Water in Jordan is contested between sectors. On the ministry's 2024 figures agriculture used about 49% of supply, municipal and tourism use about 48%, industry around 3% and remote areas and livestock about 0.5%.2

Water use by sector (2024)

Share of national water use, % (Water Budget 2024)

  • Agriculture48.6%
  • Municipal and tourism47.8%
  • Industry3.2%
  • Remote areas and livestock0.5%

The balance has shifted over two decades. FAO’s 2008 country profile put total withdrawal in 2005 at 941 MCM, of which agriculture took 65%, households 31% and industry 4%.6 By 2023 total demand had reached about 1.2 billion m³ on the ministry's figures, with agriculture at 623 MCM and household and tourism use at 527 MCM.23 The AQUASTAT freshwater series charted below is a different series: it gives 866 MCM for 2005 and 950 MCM for 2022, against the ministry’s 1,127 MCM from all sources in 2022, so figures from the two should not be mixed.7 Refugees added pressure. Household demand in the northern governorates rose by about 40% during the years of hosting Syrian refugees.23

Irrigation in the Jordan Valley

Intensive irrigation began in 1958, when Jordan started diverting the Yarmouk into the East Ghor Canal, later renamed the King Abdullah Canal. The canal was 70 km long in 1961 and reached 110.5 km after three extensions between 1969 and 1987.6 Irrigated farming covered about a third of the cultivated area in 2004. Drip irrigation served about 85% of equipped land in the Jordan Valley and 90% in the highlands.6 Agriculture's share of GDP fell from 6% in 1992 to 3% in 2007.6

Withdrawals over time

FAO’s AQUASTAT estimates put Jordan’s freshwater withdrawals at 451 million m³ in 1975 and 950 million m³ in 2022. Agriculture’s share of the total moved from 70% in 1979 to 52% in the latest estimate (2019).

105%
of available freshwater resources withdrawn (SDG 6.4.2, FAO estimate for 2023)24
US$ 51.1
of GDP per m³ withdrawn, constant 2015 dollars (SDG 6.4.1, 2022)
9.1%
of agricultural land irrigated (2023)

Freshwater withdrawals, 1975 to 2022

Total, million m³ a year

05001,0001,5002,000198019902000201019752022950.0 million m³
Sources and notes

Source: FAO AQUASTAT via the World Bank World Development Indicators, retrieved September 2026. AQUASTAT revises national figures irregularly and fills the years between surveys, so a jump between two adjacent years usually marks a new national estimate rather than a change on the ground. Water stress (SDG 6.4.2): FAO, the custodian agency for the indicator. FAO. 2026. AQUASTAT Core Database. Food and Agriculture Organization of the United Nations. Database accessed on 2026/10/20.24 FAO gives 105% for 2023, flagged E: an estimate calculated or identified from official values or from an AQUASTAT estimation, in FAO’s definition. This figure is carried forward, not a new measurement: it repeats the value FAO gives for 2022. Jordan’s total freshwater withdrawal, from which the indicator is calculated, has not changed in AQUASTAT since 2022; FAO flags it imputed (carried forward) from 2023.

Water for farming

Irrigation took 623 million m³ in 2023: 263 million from groundwater, 168 million from surface water and 192 million from treated wastewater, or 42%, 27% and 31%.25 The split differs sharply by region. In 2021 the Jordan Valley irrigated with 29 million m³ of groundwater, 133 million of surface water and 133 million of reclaimed water, while the highlands relied mainly on groundwater, 181 million m³.26 The ministry estimates that actual groundwater use for irrigation is 100 to 140 million m³ a year above the metered records, because of unlicensed wells.26 In 2023 it counted 2,335 operating agricultural wells and backfilled 137 illegal ones.25 The irrigated area was 896,000 dunums in 2021, about 41% of the planted area, with 306,000 dunums in the Jordan Valley and 589,000 in the highlands.26 Withdrawals and basin balances are under Water resources and Water use.

Sources and notes

The table is the Department of Statistics’ 2021 count of irrigated area as reproduced in the National Water Strategy 2023–2040; the bulletin itself was not opened, and the strategy’s regional rows add up to 895 against the 896 it prints for Jordan. One dunum is 0.1 ha, so 896,000 dunums are 89,600 ha (the 41% share is calculated here from the strategy’s total planted area of 2,167 thousand dunums), the same as AQUASTAT’s area equipped for irrigation, 89,610 ha, an official value for 2021 that the database repeats, flagged imputed, for 2022 and 2023. The method split in the text is AQUASTAT’s official value for 2018 (73,733 ha localised, 15,186 ha surface and 1,687 ha sprinkler, of 90,606 ha); later splits are derived from it. The 2011–12 farmer survey of the Jordan Valley Authority reports shares of respondents, not of area. The Minister of Agriculture’s “over 95 percent” of irrigated agriculture on drip (28 August 2023) comes with no method or area base and does not match AQUASTAT’s 81%, so it is attributed, not used as a fact. The National Water Strategy’s English summary says non-conventional water for irrigation is to reach 60% relative to freshwater by 2030; its full text says 45%, from 31% in 2021. The text uses the full text. The strategy also carries two estimates of unmetered groundwater use in irrigation: about 100 million m³ a year in 2017–2019 and about 140 million m³ a year from recent remote sensing, without a year. The 2021 source split (531 million m³) is lower than the 2022 ministry booklet’s 569 million m³; both are ministry publications. Moved here from the text, older than the figures kept: the highlands used 24 million m³ of surface water and 31 million of reclaimed water in 2021;26 a survey by the Jordan Valley Authority in 2011–12 found 81% of farmers using drip and 8% surface irrigation, but only 51% using drip in the Northern Ghors.27 The irrigation tariff of JD 0.011–0.012 per m³ dates from 1994 in the sources read; no newer tariff was found. Sources: the ministry’s Facts and Figures 2023, the National Water Strategy 2023–2040 (full text and summary), the ministry’s wastewater policy (2023), the World Bank on the cost of irrigation water in the Jordan Valley (2016), the Helmholtz Centre (UFZ) nationwide evaluation of reuse (2019), AQUASTAT, Jordan News and the AFD announcement of the North Balqa plant.

Methods

AQUASTAT puts 81% of the 90,606 ha equipped for irrigation in 2018 under localised irrigation, 17% under surface irrigation and 2% under sprinklers.28 The agriculture minister said in August 2023 that over 95% of irrigated agriculture relied on drip.29 The National Water Strategy puts on-farm efficiency at around 60% and sets a target of 75% by 2032.26

Jordan: irrigated area by region and crop type, 2021, thousand dunums
RegionVegetablesField cropsTreesTotal (thousand dunums)
Jordan Valley16226118306
Highlands19858333589
Jordan3618445189626

Policy

The strategy aims for non-conventional water to reach 45% of irrigation relative to freshwater by 2030, up from 31% in 2021, and for abstraction to reach safe yield by 2035 with no illegal wells. It expects an irrigation shortfall of about 364 million m³ a year by 2040, 38% of irrigation demand.26 The ministry’s reallocation policy of 2016 caps freshwater for highland irrigation and allows irrigation to expand only where treated wastewater is available.30 The cost of service for irrigation water is around JD 0.07 per m³ against an average tariff of around JD 0.012, which was set in 1994, and the Jordan Valley Authority’s cost recovery is around 40%.26

Treated wastewater

In 2023 Jordan used 195 million m³ of its 215 million m³ of treated wastewater, and 192 million went to irrigation.25 Most of it is reused indirectly: in 2021 around 130 of 186 million m³ came from the As-Samra plant, flowed into the King Talal Dam and then to the Jordan Valley.26 Only about 9% of As-Samra effluent is used directly, by 55 farmers on 2,281 dunums.31 In 2019 the Water Authority had limited direct reuse to fodder crops and fruit trees, and Jordan prohibits irrigating vegetables eaten raw with it; unrestricted irrigation uses blended water.31 The reuse policy says that in the highlands treated water is to replace groundwater, not irrigate new land.22 The planned North Balqa plant is to make 13 million m³ a year of irrigation-grade effluent available.32 Plants are covered under Infrastructure; irrigation and reuse projects across the region are on the Agriculture & Food hub.

Infrastructure

Jordan's modern water system is dams, pumps and pipes, and much of it moves water uphill to the high-demand area around Amman: about 90% of the capital’s drinking water comes from sources 125 to 325 km away and is lifted by up to about 1,200 m.7 A substantial share is unaccounted for: the ministry estimated non-revenue water at 50% of the 520 MCM of drinking water supplied in 2022, equivalent to about 260 MCM.7 In August 2026 the water minister put national non-revenue water at 41%.10 Non-revenue water means water put into the distribution system but not billed, including physical and administrative losses such as leakage and illegal use.8 In 2024 the government and Amman’s utility, Miyahuna, signed an agreement with IFC to prepare a performance-based contract to cut losses across a third of Amman’s network.33 The National Water Strategy targets cutting non-revenue water to 35% once the national conveyance project operates and to 25% by 2040; getting there is mostly a question of capital and metering rather than of technique.8

Tracked projects

Tracked projects in Jordan by asset class
Asset classProjectsDisclosed valueLargest by value
Desalination2US$ 6,135 mAqaba–Amman Desalination & Conveyance (AAWDC)
Wastewater and reuse4US$ 144 mNorth Balqa Wastewater Treatment Plant
Conveyance, storage and dams15US$ 2,045 mDisi Water Conveyance (BOT)
Networks and other3––

Open the project database for Jordan

The National Water Carrier, finally moving

The answer on the supply side is the Aqaba–Amman Water Desalination & Conveyance project, usually shortened to AAWDC. It pairs a 300 million m³/year desalination plant on the Red Sea with a conveyance of about 438 km north to Amman, as given in the project’s 2025 environmental and social impact assessment; it is the largest infrastructure project in Jordan’s history.3 The final technical and legal agreements were signed in April 2026, with financial close targeted for July34 and still pending in September.4 Capital cost is about US$4.3 billion, or US$5.8 billion once financing is counted. The structure is a build-operate-transfer concession, under which the private side builds the works, runs them for an agreed period and hands them over.34 Meridiam and SUEZ hold the project company,3 with Vinci and Orascom building.35 Ground preparation has started. First water is planned around the end of the decade;4 until then, every dry year must be bridged from storage, wells and rationing.

The carrier itself grew out of the earlier Red Sea–Dead Sea concept, which would have used the same Aqaba intake to slow the Dead Sea's fall as well as supply drinking water. That version was shelved.36 Financing for the scheme now under way comes from AIIB, EBRD, IFC, KfW, AFD and the Green Climate Fund,35 the European Investment Bank34 and the US International Development Finance Corporation (DFC), which approved a financing package in September 2026.4 Published cost figures vary: MEED recorded a US$3 billion contract award in January 2025,37 the ministry estimated about US$2.5 billion in May 2025,23 and the April 2026 agreement gave the capital cost above.38 The figures are not stated on the same basis, so they are best not compared directly.

The Disi conveyance

The Disi Water Conveyance Project transports water some 325 km from a fossil aquifer on the Saudi border to Amman and the northern cities. Operational since 2013 at a total project cost its US lender put at US$987.6 million, it supplies roughly 100 MCM/yr.39 The aquifer is shared with Saudi Arabia (see Shared waters).

Jordan: Conveyors and transfers in the MENA Water Review major projects register
Conveyors and transfers in the registerCapacity (million m³/year)Length as statedStatusAward or startCommissioned
Aqaba–Amman Desalination & Conveyance (AAWDC)300438 kmUnder construction––
Disi Water Conveyance (BOT)100–Operating20132013
Wadi Al Arab Water System II30–Operating20152020
King Abdullah Canalabout 150 conveyed in 1998110 kmOperating––

Register records only, not a complete national inventory.

Sources and notes

Source: the MENA Water Review major projects register. Ranked by capacity in million m³ a year as each record states it; a figure the record gives only in another unit is shown as written and not ranked. Each name links to the project record and its sources.

Dams and reservoirs

Dry years bite hard. In 2021 six of Jordan's 14 dam reservoirs dried up as rainfall fell to 60% of the annual average.40 The wet winter of 2025–26 reversed that, and King Talal Dam reached its full 75 MCM in March 2026.41

Largest dams in the FAO AQUASTAT inventory
Largest dams in the FAO AQUASTAT inventoryRiverCompletedStorage (million m³)
King TalalZarqa River198775
Wehda (Unity)Yarmouk River200655
KaramahWadi Al Mallaha199852.5
MujibWadi Al Mujib200331.2
Wadi ArabWadi Arab198620
TannourWadi Al Hasa200116.8
Dams in the FAO AQUASTAT inventory on the main rivers of Jordan
Main riverDams in the inventory · storageLargest reservoir
Jordannone in the inventory–
Wadi Mujib1 · 31.2 MCMMujib (2003), 31.2 MCM
Yarmouk1 · 55 MCMWehda (Unity) (2006), 55 MCM
Zarqa1 · 75 MCMKing Talal (1987), 75 MCM

Wastewater treatment plants

Jordan: Largest wastewater treatment plants, Water Authority of Jordan, 2023
Largest wastewater treatment plants, Water Authority of Jordan, 2023Design capacity (m³/day)
Khirbet As-Samra365,000
Aqaba Mechanical (North Aqaba)40,000a
Wadi Al-Arab (Duqara)21,000
Wadi As-Seer17,000
Ain Al-Basha (Baqa'a)14,900
Irbid Central (Fu'ara)13,358
Al-Me'rad10,000
East Jerash9,500
Kufranja9,000
Salt7,700
Madaba7,600
Mutah, Mazar and Adnaniyya7,000
Mafraq5,500
Ramtha5,000
Al-Ekeider4,000
Ma'an3,900
Zaatari refugee camp3,500b
Wadi Musa3,400
Fuheis and Mahis2,400
Tafileh1,600
North Shouna1,200
Al-Lajjun1,200
Karak1,000
Tal Al-Mantah400
Shobak (tankers)350

Water Authority of Jordan list, not the project register.

Sources and notes

Source: Water Authority of Jordan, Wastewater in Jordan (2023), Table 3: the plants and their design capacities in m³ a day, ranked by that figure; no status or commissioning year is shown because the list data used here carries none. a Aqaba is shown at its expanded capacity of 40,000 m³/day (2022). b The Zaatari camp plant is from the Ministry of Water and Irrigation, Jordan Water Sector Facts and Figures 2022. These are the 25 plants placed on the Jordan map; Abu Nuseir (now a lift station) and South Amman, Wadi Al-Shallaleh, Wadi Hassan, Al-Mansoura and Azraq camp are not listed, because their locations could not be established. Plants that are also project records link to their project pages. The MENA Water Review major projects register also holds West Irbid Wastewater Treatment Plant (planned, 12,000 m³/day), which is not on the 2023 list.

Sources and notes

Sources: FAO AQUASTAT regional dam inventories (CC BY 4.0), which list large dams with a published capacity and can lag recent construction; the MENA Water Review major projects register, where each record cites its source on the project page. The database follows large contracted projects, not the whole asset base. Dam capacities are shown to one decimal where the record has a fraction. In the table by river, a dam is counted against the river its inventory record names, with French, Arabic, Persian and Turkish spellings of the same river treated as one; a record that gives no river is matched by its coordinates to the nearest river reach, so an unnamed dam on a tributary close to a main stem can be counted against the main stem. Records that give neither a river nor usable coordinates cannot be matched, so some rivers show fewer dams than they have. The rivers are the main rivers given under Water resources. Wehda (Unity): the AQUASTAT inventory gives 55 MCM; the Ministry of Water and Irrigation gives a design capacity of 110 MCM.7 Completion year after Zeitoun et al. (2019).42

Water quality

Overexploitation has degraded groundwater quality. Many municipal and irrigation well fields have been abandoned, Dhuleil among them.6 The Disi aquifer, which supplies Amman, carries natural radioactivity. A 2009 study led by Avner Vengosh of Duke University sampled 37 wells and found radium above WHO levels in all but one.43 Reports of the peak values differ, from up to 20 to 30 times the international thresholds.43 44 The water is blended with other sources to reduce the radiation.45

The Zarqa and the lower Jordan

The Zarqa River runs 72 km through Amman and Zarqa to King Talal Dam. Its pollution comes mainly from chemical spills by upstream factories and from sewage. Farms along it irrigate with the polluted water.20 The river passes through an area holding more than 85% of Jordan's industrial plants.46 The As-Samra plant upstream took in nearly 68% of the wastewater flowing across the country in 2021.47 A US$28 million expansion was signed in July 2026.48

The lower Jordan River has become a channel for waste, raw sewage, saline water and fishpond discharge.49 The 1994 peace treaty obliged Israel and Jordan to stop discharging untreated wastewater into the Yarmouk and the Jordan within three years.50 The 1987 agreement with Syria contains no water-quality provisions at all.42

Reuse is one of Jordan's strengths. In the mid-2000s more than 80% of Greater Amman's sewage was treated and released to the Zarqa, then stored at King Talal Dam to irrigate the middle Jordan Valley.6 The health ministry is responsible for drinking-water safety.6

The reported indicators

89%
of people use safely managed drinking water (2024)
77%
of domestic wastewater safely treated (SDG 6.3.1, 2024)
100%
of monitored water bodies with good ambient quality (SDG 6.3.2, 2020)

Drinking water services

Share of the population, %

025507510020052010201520202000202489 Safely managed99 At least basic

On the latest values each country reports for SDG indicator 6.3.1, Jordan’s 77% (2024) ranks 6th of the 17 countries covered here that report it; years differ by country. The regional comparison is in the wastewater and reuse dashboard.

Sources and notes

Sources: WHO/UNICEF Joint Monitoring Programme via the World Bank; SDG 6.3.1 and 6.3.2 from the UN Statistics Division SDG database, retrieved September 2026. Safely managed drinking water means an improved source on the premises, available when needed and free from faecal and priority chemical contamination. SDG 6.3.2 rests on each country’s own monitoring network, so a high share can mean few water bodies were assessed, and values move when methods change between reporting rounds.

Shared waters

About 26% of Jordan's water resources are shared with neighbours, on the ministry's figures.23 UNECE puts the figure for water resources shared with neighbouring countries at around 40%.51 The main shared systems are the Yarmouk with Syria, the Jordan with Israel, and the Disi aquifer with Saudi Arabia. In February 2026 Jordan joined the UN Water Convention, the second Middle Eastern state after Iraq.52

The Yarmouk and Syria

Jordan and Syria signed their first Yarmouk agreement in Damascus on 4 June 1953. It planned a joint dam at Maqarin, with Jordan bearing 95% of construction costs and Syria taking 75% of the electricity.53 A new agreement, signed in Amman on 3 September 1987, replaced it. Jordan would finance the Wehda dam, but the dam could store water only after 26 Syrian reservoirs listed in the annex, holding 134 MCM, had filled.54 42 The 1987 agreement places no limits on groundwater abstraction. Because the aquifer is hydraulically connected to the river, pumping from wells can diminish its flow, at least in the Hauran Plain.42

Upstream use outran the treaty. Satellite analysis identified 32 Syrian dams in the basin, with an estimated total storage capacity of 197 MCM.42 The Yarmouk's average flow, gauged near its confluence with the Jordan River, fell from 229 MCM a year in 1979–88 to about 40 MCM in 2008–15.42 The Wehda (Unity) Dam had an initial storage capacity of 110 MCM, while a second stage was planned to raise this to 225 MCM. Construction began in 200355 and the dam was completed in 2006 without its power-generating component.42 In July 2022 water expert Dureid Mahasneh put its contents at no more than 10–15 MCM, and Syria turned down Jordan's request for 30 MCM.56

The change of government in Damascus reopened the file. In July 2025 a joint technical committee met at the dam, and Syria said it was ready to re-examine the 1987 shares.57 In April 2026 the two states launched a study of the basin with Swiss support and a joint platform for water data.58 59

Israel: the treaty and the add-ons

The 1955 Johnston Plan would have given Jordan 55% of the basin's water, but it was never signed.6 Water became a front line instead. In 1969 Israel attacked the East Ghor Canal on suspicion that Jordan was diverting too much.6

The 1994 peace treaty settled allocations in Annex II. Israel pumps 12 MCM from the Yarmouk in summer and 13 MCM in winter. It takes an extra 20 MCM in winter, in exchange for 20 MCM of Jordan River water delivered to Jordan in summer. Both sides undertook to find a further 50 MCM a year of drinking water.50 Practice has departed from the text. Jordanian records show Israel pumping about 47 MCM a year from Lake Tiberias to the King Abdullah Canal, more than twice the 20 MCM in the treaty. Israel alone uses the excess flood flows.42

In July 2021 the two foreign ministers agreed that Jordan would buy an extra 50 MCM a year;60 the deal was signed that October.61 Israel renewed the deal in six-month steps, but it lapsed at the end of 2025.62 63 In July 2026 Israel reportedly tied renewal to Jordan moderating its rhetoric and restoring full diplomatic ties.64 A June 2026 IMF report, as cited by Noon Post, put the loss to Amman at 50 MCM a year.23

Cancelled and failed deals

Two larger schemes failed. Jordan and Israel agreed in 2013 and 2015 to pipe Red Sea water north, sending part of it on to the Dead Sea.36 65 On 17 June 2021 Jordan withdrew, concluding there was no real desire for the project on the Israeli side.36 On 22 November 2021 Israel, Jordan and the UAE signed a declaration in Dubai. Jordanian solar power of 600 MW would be swapped for up to 200 MCM a year of Israeli desalinated water.66 Hundreds protested in Amman.67 On 16 November 2023 Foreign Minister Ayman Safadi said Jordan would not sign, because of the war in Gaza.68

The Disi aquifer and Saudi Arabia

Saudi Arabia expanded extraction from the shared Saq–Disi aquifer in the 1980s to grow wheat. Its withdrawals were estimated at over 1,000 MCM in 2008. Jordan draws some 60 MCM for farming near the border.69 On 30 April 2015 the two states signed an agreement in Riyadh. It bans groundwater-dependent activity in a protected zone within five years, limits use in a wider management zone to municipal supply, and creates a joint technical committee.70 It sets no numerical limit on extraction.69

The Dead Sea

The Jordan once carried about 1.3 billion m³ a year into the Dead Sea. A 2013 UN-ESCWA estimate put the flow at 20–200 MCM.71 The lower Jordan has lost 95% of its historical flow in 50 years, EcoPeace's director said in 2022.49 The Dead Sea fell from about 398 m below sea level in 1976 to about 430 m in 2015, and more than 1,000 sinkholes appeared in 15 years.72 At COP27 in November 2022 Israel and Jordan signed a declaration on restoring the river.49

The Dead Sea is falling by about a metre a year

Surface level, metres below Mediterranean sea level

1964 · the Jordan is diverted-390 m-400 m-410 m-420 m-430 m-440 m193019501970199020102025
Sources and notes

Approximate levels. Points to 2010 are consistent with the UN-ESCWA and BGR inventory (2013, Figure 18, compiled from Israeli Hydrological Service and Water Authority data) and the USGS EROS rates of decline; the 2020 and 2025 points are approximations not traced to one published series. Annual figures vary with rainfall; the fall averaged about 17 cm a year from 1930 to 1973 and roughly a metre a year since 2000.

A lake losing about a metre of height every year because the river that fed it is used up before it arrives.

The record

1
international river basin with a significant share in Jordan
5
transboundary aquifers mapped by IGRAC/UNESCO (2025)
26%
of transboundary basin area under an operational arrangement (SDG 6.5.2, 2023)

Shared river basin

River basins Jordan shares
BasinShared withBasin area, km²In JordanModelled natural flow, largest riverAgreements
JordanIsrael, Lebanon, Palestine, Syria45,00543%1.8 km³/yr11

The agreements

YearAgreementParties
1994Treaty of peace between the state of Israel and the Hashemite Kingdom of Jordan, done at Arava/Araba crossing pointIsrael, Jordan
1987Agreement Between The Syrian Arab Republic and The Hashemite Kingdom of Jordan Concerning the Utilization of the Yarmuk WatersHashemite Kingdom of Jordan, Syrian Arab Republic
1953Agreement between the Republic of Syria and the Hashemite Kingdom of Jordan concerning the utilization of the Yarmuk watersJordan, Syria

Joint bodies

  • Joint Syrio-Jordanian Commission (JSJC)Jordan · 1953 · Jordan, Syria
  • Joint Water Committee between Jordan and Israel (JWC3)Jordan · 1994 · Israel, Jordan

Shared aquifers

Sources and notes

For the Jordan basin, area and share follow the TFDD basin outline, which includes 174 km² in Egypt; Egypt is not listed as a riparian here because the UN-ESCWA and BGR inventory (2013) counts five riparians, Israel, Jordan, Lebanon, Palestine and Syria, and gives a basin area of 18,285 km², 40% of it in Jordan.

The register also places small areas of Jordan in the Tigris-Euphrates/Shatt al Arab basin, too little to carry here.

Source: Master Treaties Database of the Transboundary Freshwater Dispute Database (February 2023 edition), via the Transboundary Waters Atlas. Titles as recorded, with spelling normalised. The database records 8 further agreements for this basin to which Jordan is not a party. They are listed on the Transboundary Waters Atlas page for the Jordan basin.

Source: the river basin organisation database of the Transboundary Freshwater Dispute Database (2013). A joint body on paper is not evidence that it meets.

Source: IGRAC and UNESCO, Transboundary Aquifers of the World. Data reliability is IGRAC’s own assessment of the information behind each outline.

Credit: Product of the Transboundary Freshwater Diplomacy Database, College of Earth, Ocean, and Atmospheric Sciences, Oregon State University (transboundarywaters.science.oregonstate.edu). The database is not copyrighted; due credit is appreciated.

Governance & institutions

The Ministry of Water and Irrigation (MWI) sets policy and oversees the sector. Under it, the Water Authority of Jordan runs water and wastewater, and the Jordan Valley Authority manages the valley's irrigation. Service delivery runs through utilities: Miyahuna serves Amman; Yarmouk and Aqaba Water cover their own regions. The private sector has taken on more of the work over the past two decades. As-Samra was delivered as a build-operate-transfer concession. The Aqaba–Amman carrier is structured as a public-private partnership (see Infrastructure).

Key sector institutions

Sources and notes

Institutions compiled from the FAO AQUASTAT institutions database and national sources. Responsibility lines summarise this report and the organisations directory. Website links are the official sites verified for that directory; for a group of bodies, the link is one member’s site.

Challenges & outlook

Jordan's water future turns on four pressures. Climate change is reducing recharge and raising demand at once. Financial capacity is the second: the sector needs heavy investment while tariffs must remain affordable to households that already struggle to pay them. Transboundary reliability is the third, and the one Jordan controls least. Efficiency is the fourth, and the cheapest of the four to address, since the network losses set out under Infrastructure are the fastest available win.

The National Water Strategy 2023–2040 frames the response: desalinate at Aqaba, expand reuse, cut losses, and move tariffs toward cost recovery. Desalination and reuse are mainly engineering problems. Cutting losses also requires tackling leakage and illegal use, while tariff reform remains difficult.

Sources

72 references

Figures are drawn from the numbered sources below, principally the Ministry of Water and Irrigation’s water budget reporting and the National Water Strategy 2023–2040. Project and procurement details are compiled from public announcements; confirm against the original source before relying on them.

  1. FAO, AQUASTAT — Global Information System on Water and Agriculture: country water resources, withdrawals by sector and dam register. fao.org/aquastat. Latest country values as compiled at build.
  2. Ministry of Water and Irrigation (Jordan), Water Budget 2024 (Arabic), pp. 15–19, tables 8, 9 and 11: groundwater use of 677.35 MCM in 2024 against a safe yield of 418 MCM (275 MCM renewable, 143 MCM non-renewable); treated wastewater reused 197.5 MCM; total water use 1,189.2 MCM.
  3. EBRD and the Ministry of Water and Irrigation (2025), Aqaba–Amman project, environmental and social impact assessment: non-technical summary.
  4. MEED, report on US DFC approval of financing for Jordan’s National Water Carrier, 24 September 2026.
  5. UNESCO World Heritage Centre, Petra, statement of Outstanding Universal Value: a water management system of channels, tunnels, diversion dams, cisterns and reservoirs that controlled and conserved seasonal rains, dating from the first centuries BC to AD.
  6. FAO AQUASTAT, country profile: Jordan (2008 edition).
  7. Ministry of Water and Irrigation / وزارة المياه والري (Jordan), Jordan Water Sector Facts & Figures 2022: total water use of 1,127 MCM in 2022 (groundwater 656 MCM, 58%; surface water 294 MCM, 26%; treated wastewater 177 MCM, 16%); sector use 576 MCM agriculture, 518 MCM domestic, 34 MCM industry; non-revenue water of 50% on 520 MCM of drinking-water supply; safe yield and abstraction for the 12 groundwater basins.
  8. Ministry of Water and Irrigation (Jordan), National Water Strategy 2023–2040, summary: renewable fresh water of about 61 m³ per person a year, projected toward 35 m³ by 2040 without intervention; non-revenue water to fall from about 50% to 35% once the national conveyance project operates, and to 25% by 2040.
  9. USDA Foreign Agricultural Service, “Food for Progress Jordan success story: where harvesting every drop of water counts”, GAIN report, Amman, 27 June 2020.
  10. Jordan News Agency (Petra), “Water loss cut to 41%, exceeding target”, 24 August 2026.
  11. World Bank, World Development Indicators and country water-sector reporting. data.worldbank.org.
  12. World Resources Institute, Aqueduct 4.0 Water Risk Atlas (2023) — the sub-basin risk, stress and groundwater-decline layers on the interactive maps. wri.org/aqueduct. Country baseline water-stress category: Aqueduct 4.0 Current and Future Country Rankings (16 August 2023), indicator bws, all sectors, 1979–2019.
  13. White, C. (2014), “Understanding water scarcity: definitions and measurements”, in Grafton, Wyrwoll, White and Allendes (eds), Global Water: Issues and Insights, ANU Press, p. 161, giving the Falkenmark et al. (1989) thresholds.
  14. FAO, AQUASTAT Country Profile: Jordan, 2008.
  15. Government Water Authority of Israel, Dead Sea level since 1976, monthly open data (in Hebrew): 441 m below sea level on 1 July 2026 and 441.5 m on 4 October 2026.
  16. Ministry of Environment and UNDP, Jordan’s Third National Communication on Climate Change, 2014.
  17. World Bank, Jordan Country Climate and Development Report, November 2022.
  18. Hussein, H. (2018), “Tomatoes, tribes, bananas, and businessmen: an analysis of the shadow state and of the politics of water in Jordan”, Environmental Science & Policy 84; Zeitoun, M. & Warner, J. (2006), “Hydro-hegemony”, Water Policy 8(5); Al-Ansari, N. et al. (2014), “Water Demand Management in Jordan”, Engineering 6; and the 1987 Jordan–Syria agreement on the Yarmouk.
  19. FAO, Irrigation in the Near East Region in Figures: Jordan, 1997.
  20. The New Humanitarian, “Environmentalists warn of rising pollution in Zarqa River”, 6 June 2006.
  21. US Geological Survey, Open-File Report 2013-1061, groundwater-level and salinity trends in six groundwater basins of Jordan, 2013.
  22. Ministry of Water and Irrigation (Jordan), Wastewater Management and Reuse Policy, 2023: treated wastewater from 186 MCM in 2019 to 235 MCM by 2030.
  23. Noon Post, report on the Ministry of Water and Irrigation’s 2023 figures and the IMF’s June 2026 assessment, 29 July 2026.
  24. FAO. 2026. AQUASTAT Core Database. Food and Agriculture Organization of the United Nations. Database accessed on 2026/10/20. Variable “SDG 6.4.2. Water Stress” (indicator 6.4.2, level of water stress: freshwater withdrawal as a proportion of available freshwater resources; FAO is the custodian agency), read from the AQUASTAT Dissemination System.
  25. Ministry of Water and Irrigation (Jordan), Jordan Water Sector Facts and Figures 2023.
  26. Ministry of Water and Irrigation (Jordan), National Water Strategy 2023–2040, full text (FAOLEX).
  27. van den Berg and Agha Al Nimer (2016), The Cost of Irrigation Water in the Jordan Valley, World Bank.
  28. FAO. 2026. AQUASTAT Core Database. Food and Agriculture Organization of the United Nations. Database accessed on 2026/10/20. Values for the variables named in the text, read from the AQUASTAT Dissemination System with FAO’s flag on each: official value, estimate (calculated or identified from official values or from an AQUASTAT estimation) or imputed (carried forward or interpolated).
  29. Jordan News (29 August 2023), Agriculture now consumes 20% smaller share of water.
  30. Ministry of Water and Irrigation (Jordan), Water Reallocation Policy, 2016 (copy hosted by pS-Eau).
  31. Breulmann et al. (2019), Reuse of Treated Wastewater and Biosolids in Jordan: Nationwide Evaluation, Helmholtz Centre for Environmental Research (UFZ).
  32. Agence Française de Développement, press release on the Balqa and Ramtha wastewater projects.
  33. IFC, “IFC inks agreement to cut water loss and enhance water sustainability in Jordan”, 6 June 2024.
  34. Smart Water Magazine, report on the signing of the final National Water Carrier agreement, 22 April 2026: capital cost US$4.3 bn (US$5.8 bn with financing), build-operate-transfer with transfer after 26 years of operation, financial close targeted for July 2026.
  35. ENR, report on the French-led consortium to build the desalination and pipeline project, 2 February 2026.
  36. Ynetnews, report on Jordan’s withdrawal from the Red Sea–Dead Sea project, 17 June 2021.
  37. MEED, report on a record year for Jordan’s water sector, 11 June 2025.
  38. Petra, report on the signing of the National Water Carrier agreement, April 2026.
  39. US International Development Finance Corporation (formerly OPIC), Disi Water Conveyance Project, non-confidential project information.
  40. Washington Institute, “UAE to fund Israel and Jordan’s solar-water deal”, 18 November 2021.
  41. Petra, “King Talal Dam nears overflow”, 19 March 2026.
  42. Zeitoun, M. et al. (2019), “The Yarmouk tributary to the Jordan River I: agreements impeding equitable transboundary water arrangements”, Water Alternatives 12(3).
  43. IEEE Spectrum, “Jordan’s radioactive water problem”, 31 July 2009.
  44. AIP Inside Science, “Radioactivity levels in crucial Middle East water source exceed international standards”, 19 December 2018.
  45. The National, report on the Aqaba–Amman desalination project, 30 April 2023.
  46. Gulf News, “Zarqa River is now a foul-smelling stream”, 8 July 2019.
  47. Ministry of Water and Irrigation, National Water Strategy 2023–2040, 2023, PDF p.60 (As Samra share of wastewater flow in 2021).
  48. Petra, “Jordan signs $28m deal to expand As-Samra wastewater treatment plant”, 29 July 2026.
  49. Jerusalem Post, report on the Israel–Jordan Jordan River declaration, 17 November 2022.
  50. Treaty of Peace between Israel and Jordan (1994), Annex II: Water Related Matters, Avalon Project.
  51. UNECE, press release on Jordan’s accession to the Water Convention, 17 February 2026: around 40% of Jordan’s water resources are shared with neighbouring countries.
  52. The Water Diplomat, “Jordan joins UN Water Convention as 59th party”, 5 March 2026.
  53. Agreement between Syria and Jordan concerning the utilization of the Yarmuk waters, 4 June 1953.
  54. Agreement between Jordan and Syria concerning the utilization of the Yarmuk waters, 3 September 1987, UN Treaty Series vol. 1870.
  55. US Embassy Amman, diplomatic cable on the Unity Dam, February 2007, as published by WikiLeaks.
  56. Jordan News, “Syria refuses to provide Jordan with 30 MCM of water”, 20 July 2022.
  57. Roya News, “Jordan and Syria agree to share Yarmouk River water, address wells issue”, July 2025.
  58. Petra, “Jordan, Syria launch Yarmouk River study”, 19 April 2026.
  59. SANA, launch of the Jordan–Syria joint water platform, 22 April 2026.
  60. PBS NewsHour (AP), “Jordan, Israel agree to water deal, more West Bank trade”, 8 July 2021.
  61. France 24 (AFP), “Israel signs deal to double water supply to Jordan”, 12 October 2021.
  62. Ynetnews, report on the lapsed Israel–Jordan water add-on, July 2026.
  63. DW, “Jordan’s water crisis amid growing tensions with Israel”, 10 September 2026.
  64. Jerusalem Post, report on Israel halting renewal of the Jordan water deal, 7 July 2026.
  65. DW, “Red Sea water may not save drying Dead Sea”, 13 March 2015.
  66. Times of Israel, “Israel, Jordan sign UAE-brokered deal to swap solar energy and water”, 22 November 2021.
  67. Al Jazeera, “Hundreds protest in Amman against water-energy deal with Israel”, 26 November 2021.
  68. Al Jazeera, “Jordan says it will not sign energy and water exchange deal with Israel”, 16 November 2023.
  69. International Water Law Project, “The newest transboundary aquifer agreement: Jordan and Saudi Arabia cooperate over the Al-Sag/Al-Disi aquifer”, 31 August 2015.
  70. Agreement for the management and utilization of the ground waters in the Al-Sag/Al-Disi layer, Jordan and Saudi Arabia, 30 April 2015 (unofficial English translation).
  71. Los Angeles Times (AP), “Mideast’s Jordan River: rich in holiness, poor in water”, 18 August 2022.
  72. Arab News, report on the Dead Sea and the Jordan basin, December 2022.

Numbered references are linked from the superscript markers in the text. Figures without a marker come from the sources above as compiled in the site methodology.

Related knowledge hubs