West Delta Water Conservation and Irrigation Rehabilitation Project

Irrigation water transfer and distribution, Planned private design, construction and operation of a Nile surface-water irrigation system for 25,200 to 37,800 ha west of the Delta, replacing falling groundwater, with a fixed allocation of 12,400 m3 per ha per year and farmer contracts of up to 30 years; no private operator contract was signed in Egypt.

Cancelled

The record

Country
Egypt
Location
West Nile Delta
Coordinates
—
Technology
Irrigation water transfer and distribution
Capacity
Planned private design, construction and operation of a Nile surface-water irrigation system for 25,200 to 37,800 ha west of the Delta, replacing falling groundwater, with a fixed allocation of 12,400 m3 per ha per year and farmer contracts of up to 30 years; no private operator contract was signed
Capital cost
US$213 m total project cost at appraisal (World Bank, 2007), stated in US$; none of it was spent on the scheme
Stage
Cancelled
Owner or client
Government of Egypt, with the Ministry of Water Resources and Irrigation (PPP contract management)
Contractor
—
Operator
—
Finance
IBRD loan of US$145 million (not disbursed), AFD US$32 million, Netherlands grant US$6 million and up to US$30 million expected from the private operator
Award or start year
2007
Commissioned
—

Record last checked 2026-10-19.

History

Sources

3 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. World Bank, West Delta Water Conservation and Irrigation Rehabilitation Project (P087970), project record. projects.worldbank.org.
  2. Loan of US$145 million approved 21 June 2007, total project cost US$213 million, closed 30 June 2011. Independent Evaluation Group, ICR Review (24 January 2013). documents.worldbank.org.
  3. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Component 1 was to finance a private operator to design, construct and operate the surface-water irrigation system covering 25,200 to 37,800 ha; loan signed 1 September 2008, effective July 2009; bid submission postponed to 18 April 2011 and a single bid received, an insufficient basis for the Ministry to evaluate the tender; the Bank and AFD closed the project on 30 June 2011 with no Bank disbursement and no contract signed; no law governing public-private partnerships existed; about 2,850 farmers had registered interest by March 2010.