Egypt Farm-level Irrigation Modernization Project

Irrigation modernisation, Mesqa and farm-level improvements for up to 140,000 small farmers on up to 80,000 ha (200,000 feddans) in three Nile Delta command areas: 155,300 feddans (83 per cent of the 190,746 feddan target) improved by closing; diesel pumps replaced by electric ones; agricultural output per feddan up 30.9 per cent and irrigation operating costs per feddan down 46.2 per cent in Egypt.

Operational

The record

Country
Egypt
Location
Nile Delta (Mahmoudia, Manaifa and Meet Yazid canals)
Coordinates
—
Technology
Irrigation modernisation
Capacity
Mesqa and farm-level improvements for up to 140,000 small farmers on up to 80,000 ha (200,000 feddans) in three Nile Delta command areas: 155,300 feddans (83 per cent of the 190,746 feddan target) improved by closing; diesel pumps replaced by electric ones; agricultural output per feddan up 30.9 per cent and irrigation operating costs per feddan down 46.2 per cent
Capital cost
US$173.7 m total project cost expected by 30 June 2018 (World Bank completion report; US$156.6 m at the report date), stated in US$
Stage
Operational
Owner or client
Ministry of Agriculture and Land Reclamation
Contractor
—
Operator
—
Finance
IBRD loan 7984-EG of US$100 million (approved 14 December 2010), French Development Agency US$42 million and Egyptian government US$14.6 million as reported at completion, with JSDF and GIZ support
Award or start year
2010
Commissioned
—

Record last checked 2026-10-19.

History

Sources

4 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. World Bank, Egypt Farm-level Irrigation Modernization (P117745), project record. projects.worldbank.org.
  2. Board approval 14 December 2010, closed 31 December 2017, implementing agency Ministry of Agriculture and Land Reclamation.
  3. World Bank, Implementation Completion and Results Report, Loan 7984-EG (June 2018). documents.worldbank.org.
  4. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Total project cost US$156.6 million at the report date, expected to reach US$173.7 million by 30 June 2018 once the French Development Agency loan closes; loan effective 10 July 2012; restructured in June 2016 (closing date extended by 18 months, objective revised to access to modern irrigation systems); 155,300 of 190,746 feddans improved; output per feddan up 30.9 per cent and operating costs down 46.2 per cent, mainly through the switch from diesel to electric pumping.