West Irbid Wastewater Treatment Plant

Wastewater treatment, 12,000 m3/day in Jordan.

Planned

The record

Country
Jordan
Location
Irbid
Coordinates
32.530, 35.800
Technology
Wastewater treatment
Capacity
12,000 m3/day
Capital cost
Sum of the financing: EBRD US$19 m, UK US$8 m and an EU grant of EUR 2.75 m (2024), the grant converted at EUR 0.924 per US$ (World Bank official exchange rate, euro area, 2024 average)
Stage
Planned
Owner or client
Water Authority of Jordan
Contractor
—
Operator
—
Finance
EBRD sovereign loan US$19 million, UK HIPCA grant US$8 million, EU Neighbourhood Investment Platform grant EUR 2.75 million
Award or start year
2024
Commissioned
—

Record last checked 2026-09-04.

History

Sources

3 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. EBRD, West Irbid Wastewater Treatment Plant, project summary document 54056 (board 6 March 2024, status signed). ebrd.com.
  2. EBRD, EBRD, UK and EU upgrade wastewater services in Jordan, 17 December 2024. ebrd.com.
  3. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.