Sanaa Wastewater Treatment Plant

Wastewater treatment + reuse, Designed for 25,000 m3/day originally (FAO AQUASTAT, which reports the plant receiving more than 50,000 m3/day); raised to 50,000 m3/day by the 1997 to 2000 works (OPEC Fund) in Yemen.

Operational

The record

Country
Yemen
Location
Sanaa
Coordinates
15.490, 44.230
Technology
Wastewater treatment + reuse
Capacity
Designed for 25,000 m3/day originally (FAO AQUASTAT, which reports the plant receiving more than 50,000 m3/day); raised to 50,000 m3/day by the 1997 to 2000 works (OPEC Fund)
Capital cost
US$45.03 m total project cost (OPEC Fund), co-financed by the OPEC Fund (US$13.00 m), the Arab Fund for Economic and Social Development and the Government; the value of the VINCI consortium's contract is not disclosed
Stage
Operational
Owner or client
National Water and Sanitation Authority
Contractor
VINCI Construction Grands Projets, as part of a consortium
Operator
National Water and Sanitation Authority
Finance
OPEC Fund for International Development loan of US$13.00 million, Arab Fund for Economic and Social Development, and the Government of Yemen
Award or start year
1995
Commissioned
2000-05

Record last checked 2026-10-12.

History

Sources

10 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. OPEC Fund for International Development, Sanaa Sewage Treatment Project. opecfund.org.
  2. Approved 07.12.1995, signed 05.11.1996, status Completed, executing agency the National Water and Sanitation Authority, co-financiers AFESD and Government, OPEC Fund contribution US$13.00 million, total project cost US$45.03 million; the project provides wastewater disposal for about 30,000 households and on completion the treatment capacity will be boosted to 50,000 m3 per day.
  3. VINCI Construction Grands Projets, Wastewater treatment plant and intake collector, Sanaa, Yemen. vinci-construction-projets.com.
  4. Client the National Water and Sanitation Authority; project management MISR Consulting Engineers; the design was by consulting engineering firm Howard Humphreys; implementation dates November 1997 to May 2000; scope included a 200,000 m3 storage pond for irrigation, a 4 MW backup power station, 190,000 m3 of earthworks and 22,000 m3 of concrete.
  5. Coordinates left blank: the only candidate feature in OpenStreetMap carries no name tag.
  6. Sanaa is under Ansar Allah authority and the present operating entity is not established.
  7. Current operating condition after 2015 was not established from any source opened, and the stage records the plant as commissioned rather than as verified running today.
  8. Coordinates are the OpenStreetMap wastewater plant in Bani Al-Harith north of Sanaa, the only one mapped around the city, given to two decimals because the feature is unnamed.
  9. FAO AQUASTAT, country profile: Yemen (2008 edition, archived). web.archive.org.
  10. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

States that the Sanaa plant was designed to treat 25,000 m3/day and receives more than 50,000 m3/day (as recorded by the fact-check, Oct 2026).