Taweelah B IWPP

Thermal MSF + power, 162 MIGD (about 736,000 m3/day) across Taweelah B, B2 and New B; the 2008 extension alone is 314,500 m3/day (69.2 MIGD) in United Arab Emirates.

Operational

The record

Country
United Arab Emirates
Location
Al Taweelah, Abu Dhabi
Coordinates
24.766, 54.685
Technology
Thermal MSF + power
Capacity
162 MIGD (about 736,000 m3/day) across Taweelah B, B2 and New B; the 2008 extension alone is 314,500 m3/day (69.2 MIGD)
Capital cost
—
Stage
Operational
Owner or client
Taweelah Asia Power Company (TAPCO); ADWEA with Marubeni, JGC and others
Developer
Marubeni / JGC
Contractor
Fisia Italimpianti (MSF desalination for the extension)
Operator
—
Finance
Project finance on a build-own-operate basis; US$2.2 billion loan co-financed by JBIC with 15 financial institutions, signed 25 April 2005
Award or start year
2005
Commissioned
2008

Record last checked 2026-09-18.

History

Sources

5 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. JBIC, Project Financing for Taweelah B Power and Desalination Project in UAE (26 April 2005). jbic.go.jp.
  2. US$2.2 billion loan, 2,000 MW and 165 million gallons per day, BOO scheme, project company TAPCO with Marubeni, JGC and ADWEA, 20-year offtake with ADWEC. Fisia Italimpianti, Abu Dhabi, Taweelah B. fisiait.com.
  3. MSF plant of 314,500 m3/day (69.2 MIGD), project 2005-2008, client TAPCO, extension in commercial operation from 2008. TRANSCO, 2019 Seven Year Water Planning Statement (2020-2026), June 2019, Table 4.3 Existing Production Plant Site and Capacities by Technology. saudigulfprojects.com.
  4. Gross 162 MIGD across Taweelah B (70 MIGD), Taweelah B2 (23 MIGD) and Taweelah New B (68 MIGD), contract expiry 2028. Abu Dhabi Department of Energy, Nine major water desalination plants enhance Abu Dhabi's water security (22 July 2020). doe.gov.ae.
  5. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Licensed 2005, more than 736,000 m3/day, described as the largest independent power and water plant in the UAE.