Türkiye Irrigation Modernization Project

Irrigation modernisation, Irrigation service area of 50,764 ha planned under the project, of which 15,280 ha completed by September 2024; works at the Atabey, Alaşehir, Ereğli-İvriz and Uzunlu schemes (loan) and the Bolvadin scheme (GEF grant); 694.54 km of the 1,521 km of modernised distribution network built; about 17,312 water users to benefit in Turkey.

Under construction

The record

Country
Turkey
Location
Atabey, Alaşehir, Ereğli-İvriz and Uzunlu schemes
Coordinates
—
Technology
Irrigation modernisation
Capacity
Irrigation service area of 50,764 ha planned under the project, of which 15,280 ha completed by September 2024; works at the Atabey, Alaşehir, Ereğli-İvriz and Uzunlu schemes (loan) and the Bolvadin scheme (GEF grant); 694.54 km of the 1,521 km of modernised distribution network built; about 17,312 water users to benefit
Capital cost
US$254 m total project cost at approval (World Bank, 2019) plus the US$95 m additional IBRD loan (approved October 2024), both stated in US$; the US$2 m GEF grant is inside the US$254 m
Stage
Under construction
Owner or client
General Directorate of State Hydraulic Works (DSİ)
Contractor
—
Operator
—
Finance
IBRD loan of US$252 million (EUR 222.3 million) and a US$2 million GEF grant, approved 22 January 2019; additional IBRD loan of US$95 million approved 17 October 2024
Award or start year
2019
Commissioned
—

Record last checked 2026-10-19.

History

Sources

5 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. World Bank, Türkiye Irrigation Modernization (P158418), project record. projects.worldbank.org.
  2. IBRD loan of US$252 million, board approval 22 January 2019, total project cost US$254 million, closing date 31 December 2028, implementing agency DSİ. World Bank, Additional Financing: Türkiye Irrigation Modernization Project (P181624), project record. projects.worldbank.org.
  3. Additional IBRD loan of US$95 million, board approval 17 October 2024, DSİ implementing.
  4. World Bank, Project Paper on a Proposed Additional Loan, Türkiye Irrigation Modernization (24 September 2024). documents.worldbank.org.
  5. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Loan agreement signed 15 February 2019 and effective 30 May 2019; planned service area 50,764 ha of which 15,280 ha completed; 694.54 km of the 1,521 km network modernised; the Ereğli-İvriz contract completed and Uzunlu 80 per cent complete; the Atabey and Alaşehir contracts terminated on 3 May and 8 August 2023 and rebid; the additional financing is to complete those two schemes and the closing date moves from 27 February 2026 to 31 December 2028. The GAP area is not covered (see GAP Irrigation Modernisation).