Tishreen Dam

Dam and hydroelectric scheme, 1,900 million m3 reservoir; 630 MW across six turbines in Syria.

Operational

The record

Country
Syria
Location
Sarrin
Coordinates
36.381, 38.186
Technology
Dam and hydroelectric scheme
Capacity
1,900 million m3 reservoir; 630 MW across six turbines
Capital cost
—
Stage
Operational
Owner or client
—
Contractor
—
Operator
—
Finance
—
Award or start year
1999
Commissioned
1999

Record last checked 2026-10-11.

History

Sources

12 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. ESCWA and BGR, Inventory of Shared Water Resources in Western Asia, Chapter 1, Euphrates River Basin (2013). waterinventory.org.
  2. Table 3 gives Syria, Tishreen, 1999, 1,900 million m3, hydropower.
  3. Vakur Sumer, ORSAM, War over Tishreen Dam (12 Jan 2016). orsam.org.tr.
  4. Construction started 1991 and completed 1999; capacity 630 MW with six turbines; height 40 metres; the main purpose is hydropower and it supplies most of the electricity of northern Syria.
  5. UN OCHA, Syrian Arab Republic Flash Update No. 12 on recent developments (21 Jan 2025). reliefweb.int.
  6. The Tishreen Dam has been non-functional for six weeks, depriving 413,000 people in Menbij and Ain al-Arab of water and electricity, with hostilities hindering repair efforts.
  7. FDD's Long War Journal (15 Apr 2025). longwarjournal.org.
  8. Records an agreement for the SDF to withdraw and transfer control to Damascus general security forces.
  9. Coordinates from OpenStreetMap.
  10. The dam is recorded as out of service (built and operated, not pipeline) because the last verified state is non-operational from 10 December 2024, and no source opened confirms a restart.
  11. SANA, 31 Jan 2026. sana.sy.
  12. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

The dam has been reconnected to Syria's national power grid for the first time in a year; its turbines are now able to generate electricity.