Shuqaiq RO1 Replacement (Shuqaiq 4)
Seawater RO, 400,000 m3/day in Saudi Arabia.
The record
- Country
- Saudi Arabia
- Location
- Shuqaiq
- Coordinates
- 17.670, 42.060
- Technology
- Seawater RO
- Capacity
- 400,000 m3/day
- Capital cost
- US$384 million
- Stage
- Operational
- Owner or client
- Saline Water Conversion Corporation, now the Saudi Water Authority
- Contractor
- ACCIONA Agua with Al-Rashid Trading and Contracting Company (RTCC)
- Operator
- Saudi Water Authority
- Finance
- Saudi government capital budget
- Award or start year
- 2020
- Commissioned
- 2023
Record last checked 2026-09-18.
History
- 2020-12
ACCIONA and RTCC awarded the US$384 million contract by SWCC
- 2023-12
Plant ramped to full production during final testing
- 2025-11
ACCIONA announced completion of construction and commissioning
Sources
8 references
Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.
- SaudiGulf Projects, Acciona and RTCC secure US$384 million Shuqaiq 4 desalination plant in Saudi Arabia, 21 December 2020. saudigulfprojects.com.
- US$384 million design and construction contract from SWCC, 400,000 m3/day, marine, civil and electromechanical works, completion expected in 2023. ACCIONA project page, Shuqaiq 4 SWRO.
- 400,000 m3/day EPC for SWCC on the Red Sea coast in the south west, serving 3.5 million inhabitants, replacing the previous facility.
- Smart Water Magazine, ACCIONA ramps up Shuqaiq 4 and Jubail 3B desalination plants to full production, 27 December 2023. smartwatermagazine.com.
- both plants ramping to full capacity during final testing, Shuqaiq 4 serving 3.5 million people in the south west.
- ACCIONA announced construction completion again in November 2025, so the 2023 date is treated as first full production.
- SHARAKAT, 7 Year Statement 2025-2031, March 2026, Table 27 (Aseer and Jazan supply sources). sharakat.com.sa.
- MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.
lists this plant as the Shuqaiq RO1 replacement, on production since 2023 at 400,000 m3/day with retirement in 2058 and no Sharakat tendering footnote, and lists a SEPARATE Shuqaiq 4 under planning with commercial operation in 2029. The two share a name in common usage and a capacity, but not an owner, a structure or a date. ACCIONA's award release of December 2020 called this plant Shuqaiq SWRO 1; the Shuqaiq 4 label attached to it later. The Saudi Water Authority's own current name for it could not be confirmed, because swcc.gov.sa and swa.gov.sa both sit behind a human-verification wall.