Shuqaiq RO1 Replacement (Shuqaiq 4)

Seawater RO, 400,000 m3/day in Saudi Arabia.

Operational

The record

Country
Saudi Arabia
Location
Shuqaiq
Coordinates
17.670, 42.060
Technology
Seawater RO
Capacity
400,000 m3/day
Capital cost
US$384 million
Stage
Operational
Owner or client
Saline Water Conversion Corporation, now the Saudi Water Authority
Operator
Saudi Water Authority
Finance
Saudi government capital budget
Award or start year
2020
Commissioned
2023

Record last checked 2026-09-18.

History

Sources

8 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. SaudiGulf Projects, Acciona and RTCC secure US$384 million Shuqaiq 4 desalination plant in Saudi Arabia, 21 December 2020. saudigulfprojects.com.
  2. US$384 million design and construction contract from SWCC, 400,000 m3/day, marine, civil and electromechanical works, completion expected in 2023. ACCIONA project page, Shuqaiq 4 SWRO.
  3. 400,000 m3/day EPC for SWCC on the Red Sea coast in the south west, serving 3.5 million inhabitants, replacing the previous facility.
  4. Smart Water Magazine, ACCIONA ramps up Shuqaiq 4 and Jubail 3B desalination plants to full production, 27 December 2023. smartwatermagazine.com.
  5. both plants ramping to full capacity during final testing, Shuqaiq 4 serving 3.5 million people in the south west.
  6. ACCIONA announced construction completion again in November 2025, so the 2023 date is treated as first full production.
  7. SHARAKAT, 7 Year Statement 2025-2031, March 2026, Table 27 (Aseer and Jazan supply sources). sharakat.com.sa.
  8. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

lists this plant as the Shuqaiq RO1 replacement, on production since 2023 at 400,000 m3/day with retirement in 2058 and no Sharakat tendering footnote, and lists a SEPARATE Shuqaiq 4 under planning with commercial operation in 2029. The two share a name in common usage and a capacity, but not an owner, a structure or a date. ACCIONA's award release of December 2020 called this plant Shuqaiq SWRO 1; the Shuqaiq 4 label attached to it later. The Saudi Water Authority's own current name for it could not be confirmed, because swcc.gov.sa and swa.gov.sa both sit behind a human-verification wall.