Doha South Sewage Treatment Works

Wastewater treatment, 241,000 m3/day design capacity after expansion (from 110,000); 180,000 m3/day delivered by this phase (from 106,000) in Qatar.

Operational

The record

Country
Qatar
Location
Doha (Nuaija)
Coordinates
25.200, 51.420
Technology
Wastewater treatment
Capacity
241,000 m3/day design capacity after expansion (from 110,000); 180,000 m3/day delivered by this phase (from 106,000)
Capital cost
QR 691.2 m total cost of the expansion works (Ashghal project page; contract from 27 June 2010), converted at QR 3.64 per US$ (World Bank official exchange rate, 2010 average); whole-plant cost not disclosed
Stage
Operational
Owner or client
Ashghal (Public Works Authority)
Contractor
Larsen & Toubro and Gulfar consortium
Operator
—
Finance
Government
Award or start year
2010
Commissioned
—

Record last checked 2026-09-18.

History

Sources

2 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Ashghal (Qatar Public Works Authority), Expansion Works for Doha South Sewage Treatment Plant (project page, status complete). ashghal.gov.qa.
  2. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

At Nuaija in south Doha, contract of QR 691.2 million to the Larsen and Toubro with Gulfar consortium from 27 June 2010, consultant KEO International Consultants, completion targeted for the first quarter of 2016. The page carries two capacity statements: this phase raises daily throughput from 106,000 to 180,000 m3/day, while overall treatment capacity rises from 110,000 to 241,000 m3/day. The Al Wakrah and Al Wukair sewage treatment works, signed as a public-private partnership in September 2022 with a consortium led by Metito Utilities, is a separate project and is not tracked here. The contract value covers the expansion works this row records; the whole-plant cost is not disclosed. Ashghal gives the status as complete with completion expected in the first quarter of 2016; no dated commissioning was found, so no commissioning year is entered. The conversion rate and its source are given in the budget note.