Resilient and Sustainable Water in Agriculture Project

Irrigation modernisation, Component 2, modernisation of irrigation and drainage services, of US$136.6 million: hydrant modernisation in the Souss-Massa sectors 808 and 809 (4,332 ha improved by 30 June 2025) and works in the Tadla sectors G5 and G9; plus water governance (a pilot tradable water allocation platform in Tadla) and advisory services on modern on-farm irrigation in Morocco.

Under construction

The record

Country
Morocco
Location
Tadla and Souss-Massa irrigation areas
Coordinates
—
Technology
Irrigation modernisation
Capacity
Component 2, modernisation of irrigation and drainage services, of US$136.6 million: hydrant modernisation in the Souss-Massa sectors 808 and 809 (4,332 ha improved by 30 June 2025) and works in the Tadla sectors G5 and G9; plus water governance (a pilot tradable water allocation platform in Tadla) and advisory services on modern on-farm irrigation
Capital cost
US$182.25 m total project cost at approval (World Bank, 2022), stated in US$; the IBRD loan is US$180 m (EUR 161.4 m)
Stage
Under construction
Owner or client
Ministère de l'Agriculture (Direction de l'Irrigation et de l'Aménagement de l'Espace Agricole, DIAEA), with ORMVA du Souss-Massa, ORMVA du Tadla and ONCA
Contractor
—
Operator
—
Finance
IBRD loan of EUR 161.4 million (US$180 million equivalent), approved 25 March 2022
Award or start year
2022
Commissioned
—

Record last checked 2026-10-19.

History

Sources

6 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. World Bank, Resilient and Sustainable Water in Agriculture (P175747), project record. projects.worldbank.org.
  2. IBRD loan US$180 million, board approval 25 March 2022, total project cost US$182.25 million, closing date 30 June 2028, implementing agency the Ministry of Agriculture, Directorate of Irrigation.
  3. World Bank, Disclosable Restructuring Paper (23 June 2026). documents.worldbank.org.
  4. Approved 25 March 2022 and effective 9 June 2022; loan of EUR 161.4 million; components of US$20.4 million (governance), US$136.6 million (modernisation of irrigation and drainage services), US$17.5 million (advisory services) and US$5.0 million (management); disbursement US$47.19 million (26 per cent) in June 2026; all remaining contracts to be awarded by the end of 2026. World Bank, Implementation Status and Results Report, Sequence 9 (29 June 2026). documents.worldbank.org.
  5. 4,332 ha in the Souss-Massa area benefit from modernised hydrants in sectors 808 and 809. World Bank, Project Information Document (25 January 2022). documents.worldbank.org.
  6. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Scaling irrigation modernisation mainly in the Tadla and Souss-Massa regions.