Great Man-Made River Fifth Phase (Kufra–Butnan–Jabal Akhdar)

Fossil-aquifer conveyance, Over 2.5 million m3/day through about 1,500 km of new pipelines, from 320 wells south of Kufra and 100 east of Sarir (as reported) in Libya.

Planned

The record

Country
Libya
Location
Kufra and Sarir to Tobruk, Derna, Jabal Akhdar, Al Marj and Ajdabiya
Coordinates
29.000, 20.000
Technology
Fossil-aquifer conveyance
Capacity
Over 2.5 million m3/day through about 1,500 km of new pipelines, from 320 wells south of Kufra and 100 east of Sarir (as reported)
Capital cost
US$7 bn as reported by AGBI (opinion article, 2 December 2024) for finalising the river over six years; not an official cost estimate
Stage
Planned
Owner or client
Great Man-Made River Authority
Contractor
—
Operator
—
Finance
—
Award or start year
—
Commissioned
—

Record last checked 2026-10-12.

History

Sources

2 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. AGBI, Libya prepares final phase for giant man-made river, opinion article by Salem Maiar, 2 Dec 2024. agbi.com.
  2. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

(read via the Internet Archive copy, 12 Oct 2026). States that Libya is planning to finalise the Great Man-Made River Project at a cost of US$7 billion over six years; that after 10 months of technical study the GMMRP board has officially committed to constructing the fifth and final phase; that Kufra-Butnan-Jabal Akhdar, also known as the Fifth River, will use 320 wells south of Kufra and 100 more east of Sarir, with about 1,500 km of new pipelines and a total capacity of over 2.5 million m3/day, in branches towards Tobruk (400,000 m3/day), Derna (250,000), Jabal Akhdar (300,000), Al Marj (445,000) and the Ajdabiya regulating reservoir (400,000); and that the project has cost US$25 billion to date. The article gives no completion year and no source for the US$7 billion. The row was previously a rehabilitation estimate of US$900 million that no source stated (fact-check Libya, Oct 2026).