Bisri Dam

Dam and water supply scheme, 125 million m3 reservoir (design); dam never built in Lebanon.

Cancelled

The record

Country
Lebanon
Location
Bisri
Coordinates
33.575, 35.508
Technology
Dam and water supply scheme
Capacity
125 million m3 reservoir (design); dam never built
Capital cost
US$617 m original project cost (2014); World Bank financing cancelled in 2020 and the project closed in June 2024; listed for resumed construction in the 2024–2035 national water strategy
Stage
Cancelled
Owner or client
Council for Development and Reconstruction
Contractor
None mobilised; the World Bank recorded that the contractor had not been mobilised at the worksite
Operator
—
Finance
IBRD loan US$474m; Islamic Development Bank US$128m; Government of Lebanon US$15m
Award or start year
2014
Commissioned
—

Record last checked 2026-10-11.

History

Sources

11 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. World Bank, Lebanon Water Supply Augmentation Project (Bisri Dam) programme page. worldbank.org.
  2. Storage 125 million cubic meters; total cost US$617 million; site 35 kilometers south of Beirut immediately upstream of the village of Bisri; 26 km gravity tunnel with treatment at Wardanieh; over 1.6 million beneficiaries.
  3. World Bank, Cancellation of Water Supply Augmentation Project statement (4 Sep 2020). worldbank.org.
  4. The government submitted a draft Ecological Compensation Plan on 12 August 2020 and the Bank's 25 August comments were not addressed to its satisfaction; the contractor had not been mobilized at the worksite.
  5. World Bank, Bisri Dam project cancellation factsheet (Sep 2020). worldbank.org.
  6. US$244 million cancelled effective 5 September 2020; about US$197 million disbursed; 861 landowners paid US$155 million in expropriation fees; partial suspension from 26 June 2020. World Bank, project detail P125184. projects.worldbank.org.
  7. Board approval 30 September 2014; implementing agency the Council for Development and Reconstruction; closed 30 June 2024. Coordinates from the OpenStreetMap way for the Bisri dam site.
  8. The dam height of 73 m circulating in secondary summaries could not be confirmed and is omitted.
  9. World Bank, Implementation Completion and Results Report, Water Supply Augmentation Project P125184 (2025). documents1.worldbank.org.
  10. The project closed on its actual closing date of 30 June 2024; US$244 million was cancelled in 2020 and a further US$19.3 million in 2022. Ministry of Energy and Water, Lebanon's National Water Strategy 2024-2035 (June 2024). bdd.pseau.org.
  11. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

lists Bisri among the dams whose construction is to resume by 2030.