North Balqa Wastewater Treatment Plant

Wastewater treatment + reuse, 36,000 m3/day at first, expandable to 54,000 m3/day by 2042; about 13 million m3/year of effluent treated to irrigation standards, discharged to the King Talal Dam lake and reused for irrigation in the Jordan Valley below it, freeing freshwater for drinking supply; replaces an overloaded existing plant in Jordan.

Awarded

The record

Country
Jordan
Location
Balqa, near King Talal Dam
Coordinates
—
Technology
Wastewater treatment + reuse
Capacity
36,000 m3/day at first, expandable to 54,000 m3/day by 2042; about 13 million m3/year of effluent treated to irrigation standards, discharged to the King Talal Dam lake and reused for irrigation in the Jordan Valley below it, freeing freshwater for drinking supply; replaces an overloaded existing plant
Capital cost
EUR 75 m AFD financing package (AFD, December 2020) converted at EUR 0.8755 per US$ (World Bank official exchange rate, euro area, 2020 average); financing, not the total project cost
Stage
Awarded
Owner or client
Water Authority of Jordan
Contractor
Passavant Energy & Environment (Drake and Scull International), design, build and one year of operation
Operator
—
Finance
French Development Agency financing package of EUR 75 million, including a EUR 15 million EU Neighbourhood Investment Platform grant
Award or start year
2020
Commissioned
—

Record last checked 2026-10-19.

History

Sources

6 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. AFD, A 20 Million Euros grant to support the expansion and rehabilitation of municipal wastewater collection and treatment systems in Balqa and Ramtha, 10 December 2020 (Wayback Machine copy of afd.fr). web.archive.org.
  2. EUR 75 million AFD package with a EUR 15 million EU grant; new plant near King Talal Dam of 36,000 m3/day expandable to 54,000 m3/day by 2042; effluent discharged to the dam lake and then contributing to agricultural irrigation in the Jordan Valley downstream; 13 million m3/year treated to irrigation standards.
  3. Drake and Scull International, press release, 28 April 2025. feeds.dfm.ae.
  4. Passavant awarded the design, construction and operation contract by the Water Authority of Jordan, valued at JOD 41.5 million, financed by AFD and EU-NIP, with the treated effluent transferred to King Talal Dam to support agricultural reuse in the Jordan Valley.
  5. ICE Amman, Launch of the North Balqa wastewater treatment plant project (28 April 2026, citing Khaberni News; secondary). ice.it.
  6. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

A site visit by the French ambassador and a World Bank representative; no construction progress figure was found.