Fifth Line to Jerusalem

Water transmission pipeline, 150 million m3/year, rising to about 450 million m3/year in Israel.

Operational

The record

Country
Israel
Location
Jerusalem
Coordinates
—
Technology
Water transmission pipeline
Capacity
150 million m3/year, rising to about 450 million m3/year
Capital cost
NIS 2.5 bn (completion, October 2022), converted at ILS 3.36 per US$ (World Bank official exchange rate, 2022 average)
Stage
Operational
Owner or client
Mekorot (State of Israel)
Contractor
—
Operator
Mekorot
Finance
Mekorot
Award or start year
2022
Commissioned
2022-10

Record last checked 2026-09-18.

History

Sources

3 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. Jerusalem Post, Mekorot completes fifth water transmission system for Jerusalem, 4 October 2022. jpost.com.
  2. about NIS 2.5 billion over six years of construction, a 13 km tunnel through the Jerusalem hills, 3 m diameter, initial transfer of about 150 million m3/year rising to about 450 million m3/year, carrying desalinated seawater from the coast and replacing the fourth system in service since 1994. Mekorot project page, The Fifth Line to Jerusalem. mekorot-int.com.
  3. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

water lifted from sea level to 900 m, 13 km section of 4 m diameter, pumping stations at both tunnel portals, first segment completed 2014 and the second in 2022, bored by TBM. The conversion rate and its source are given in the budget note. Linear scheme, so coordinates are left blank.