Tubli Water Pollution Control Centre

Wastewater treatment + reuse, 400,000 m3/day after phase 4 expansion (from 200,000 m3/day) in Bahrain.

Under construction

The record

Country
Bahrain
Location
Tubli
Coordinates
26.190, 50.550
Technology
Wastewater treatment + reuse
Capacity
400,000 m3/day after phase 4 expansion (from 200,000 m3/day)
Capital cost
BD78 m cost of the Phase 4 expansion (Gulf Daily News via FCCIB, 10 January 2024), converted at BD 0.376 per US$ (World Bank official exchange rate, 2024 average)
Stage
Under construction
Owner or client
Ministry of Works, Municipalities Affairs and Urban Planning, Bahrain
Contractor
WTE Wassertechnik, Azmeel Contracting and Tecton Engineering consortium (Cebarco civil subcontractor)
Operator
—
Finance
Grants from Saudi Arabia and Kuwait under the Gulf Development Programme
Award or start year
2018
Commissioned
—

Record last checked 2026-09-04.

History

Sources

6 references

Every field in the record above is taken from the references below. A field that none of them confirms prints as a dash.

  1. MEED, Bahrain awards Tubli wastewater plant expansion deal, 9 September 2018. meed.com.
  2. Gulf Construction, Tubli, Sitra STPs make progress in Bahrain, 1 August 2024. gulfconstructiononline.com.
  3. WTE Wassertechnik, Wastewater treatment and sewage sludge incineration, Tubli, Bahrain. wte.de.
  4. Ministry of Works, Tubli Sewage Treatment Plant Expansion Project Phase Four. works.gov.bh.
  5. FCCIB (from Gulf Daily News), BD78m upgrade of Tubli water treatment plant 77pc complete, 10 January 2024. fccib.net.
  6. MENA Water Review major projects register and PPP pipeline — compiled from procurer publications, development-bank project pages and trade reporting; each record names its source.

Phase 4 77 per cent complete, project cost BD78 million, consortium WTE Wassertechnik, Azmeel Contracting and Construction Corporation and Tecton Engineering and Construction. Stage: the latest dated report read (Gulf Construction, August 2024) puts Phase 4 at about 80 per cent; no completion report was found, so the row stays under construction.