Water in Tunisia
Doing business in Tunisia? Read the Market Brief
Overview
Tunisia receives most of its rain in the north, where dams capture it and canals carry it to Tunis and the SahelSahel (Tunisia) Al-Sāḥil, one of the large plains on Tunisia’s eastern coast, lying south of Sousse. Source: Tunisia, Encyclopædia Britannica. The centre and south rely on groundwater; in the south, much of it is fossil waterFossil water Groundwater held in deep aquifers that renew very slowly, by less than 1% a year, so it is treated as non-renewable. Source: Fossil groundwater: abstraction, UN ESCWA Sustainable Development Glossary (FAO AQUASTAT definition).1 The country already uses almost all the water it can capture.2 Recent droughts brought rationing, and seawater desalination plants have since entered service along the eastern coast.3 4 5 Silting dams, leaking networks and a water code still under revision will all shape what comes next.6 7 8
Tunisia’s cities have long drawn their water from far away. In the 2nd century AD, a Roman aqueduct system, about 132 km in all, carried spring water from Mount Zaghouan to Carthage.9 10 It was destroyed and rebuilt in sections several times. Restored and brought back into service in 1862, it still supplies Tunis.10 In Kairouan, the AghlabidAghlabids An Arab Muslim dynasty that ruled Ifrīqīyah (Tunisia and eastern Algeria) from 800 to 909, with its capital at Kairouan. Its public works for storing and distributing water helped the country prosper. Source: Aghlabid dynasty, Encyclopædia Britannica basins, built in the 860s, stored water for the town; the larger pool holds more than 57,000 m³.11 12 At independence in 1956, about 65,000 ha were irrigated, mostly from springs and artesian wells.1 The state then turned to dams. The Sidi Salem dam on the Medjerda, the country’s longest river, entered service in 1981 to supply Greater Tunis and the Sahel,13 14 and water from the north now reaches as far as Sfax.15
Drought has exposed the limits of that system. A run of dry years drew down the dams, and in March 2023 the water utility began cutting supply every night, the first government rationing in Tunisia’s history.3 16 Groundwater offers little reserve: 71 of 273 identified aquifers are overexploited.17 Tunisia has turned to the sea, with desalination plants entering service at Sfax in 2024 and at Sousse in 2026.4 5 Rain returned in 2025 and 2026, and national storage reached about 60% in June 2026,18 but silt keeps reducing what the dams can hold.6
Snapshot
Baseline water stress21
Against the scarcity line
Total renewable water per person, including inflows from upstream (2023): below the 500 m³ absolute-scarcity line. Falkenmark thresholds: water stress below 1,700, water scarcity below 1,000, absolute water scarcity below 500 m³ per person per year.22
Key institutions
- Ministry of Agriculture, Water Resources & FisheriesMinistry
- DGGREERural water directorate
- SONEDE (national water utility)Utility
- ONAS (sanitation)Utility
Financing & PPP
- PPP frameworkEmerging
- Tracked projectsUS$ 1.3 bn disclosed value in our projects register, of which US$ 0.4 bn pipeline (not yet operating)
- Active fundersWorld Bank, AfDB, KfW, AFD, JICA
- Climate adaptation planIn preparation (draft at national validation, October 2025)
Key challenges
- 01Below the absolute-scarcity line
- 02North–south imbalance
- 03Salinity of southern groundwater
- 04Ageing networks & high losses
Developments to watch
- 01Sfax desalination plant: 100,000 m³/day in service since 2024, expandable to 250,000
- 02New Water Code, in draft since 2019, still under revision in 2026
- 03Eau 2050 strategy of 43 programmes and about 1,200 measures (June 2026)
- 04About 28 km of large mains planned to move northern water to Cap Bon, the Sahel and Sfax
Sources and notes
Population: World Bank WDI, 2025.
Total water withdrawal: FAO AQUASTAT, 2023.
Total renewable water per person: FAO AQUASTAT, 2023.
Dam storage: DGBGTH.
Drinking water: WHO/UNICEF Joint Monitoring Programme (JMP), 2024 estimates, via the World Bank WDI.
Baseline water stress: WRI Aqueduct 4.0 country rankings (2023), baseline water stress, all sectors, 1979–2019: total water demand as a share of available renewable surface and groundwater supply, scored 0–5 and averaged over the country weighted by water demand.
Against the scarcity line: FAO AQUASTAT, 2023.
Sources: Water use by sector, total water withdrawal, supply by source and desalination share: FAO AQUASTAT, 2023, FAO AQUASTAT Dissemination System, retrieved 7 October 2026. Reuse share: ONAS (national sanitation office), 2023. Population and GDP: World Bank WDI, latest year (shown on each tile). Other figures: FAO AQUASTAT / national reports, latest available, approximate.
Water map
One interactive map of Tunisia's water, built from real geodata. Climate & drought maps the aridity gradient (WorldClim) with warming projections. The Water risk layer's WRI Aqueduct indicators, covering overall water risk, water stress and flood risk (plus groundwater decline where the trend is significant), shade every river sub-basin by its 0–5 risk score. Demand shows where the population, and the water demand, concentrate. Infrastructure brings the physical system together: rivers, dams (FAO AQUASTAT), treatment plants, desalination and the major conveyors. Shared waters outlines the transboundary river basins and aquifers that Tunisia shares with other countries, each drawn in full across the border; hover an outline for the countries that share it. Hover any sub-basin or marker for detail; sources are cited under each view.
Sources and notes
Interactive map: switch views, hover or focus a marker, and use the +/− controls (or double-click, then drag) to zoom and pan. Geometry and data from the MENA Water Review library.
Geography & climate
Tunisia covers 163,610 km², including 11,160 km² of lakes and chotts.1 The Dorsal, an extension of the Atlas, runs diagonally across the country from Algeria. North of it lie fertile plains; to the south come hot, dry central steppes and then the Sahara.23 The Medjerda, the longest river, flows from Algeria through the northern plains to the Gulf of Tunis.23 Chott el Djerid, a vast salt lake, lies below sea level in the south.23
A steep rainfall gradient
Average rainfall is 594 mm a year in the north, 296 mm in the centre and 156 mm in the south, and below 100 mm in the far south-west.1 The north-west is wettest: Jendouba gets more than 900 mm, and Beja, Bizerte and Le Kef more than 700 mm.23 National averages range from about 207 to 281 mm a year, depending on the dataset.1 23 Single years swing from a third of the average to three times it.1 Potential evapotranspiration of 1,200–1,800 mm a year far exceeds the rain.1
In the World Bank Climate Change Knowledge Portal’s ERA5 reanalysis, averaged over the whole of Tunisia, about 204 mm of rain falls in a year (1991–2020). Station records and national averages use other sources and baselines, so their figures can differ (the text cites national averages of about 207 mm from FAO and 281 mm for 1991–2020 in the World Bank profile). About 35% of the rain falls in October, January and March. Average rainfall in 1993–2022 was about 10% lower than in 1951–1980, and single years swing widely around that.
The year in rain and heat
Monthly rainfall (bars, mm) and mean temperature (line, °C), country average 1991–2020
Heat and drought
The mean annual temperature is 20.5 °C.23 Tunisia warmed by 0.46 °C a decade over 1971–2020. Rainfall fell by 8.91 mm a decade between 1970 and 2020, a decline that is not statistically significant nationally.23 Drought was officially declared in ten years between 1994 and 2016, and 2000–2002 was the worst in 50 years.17 The national temperature record of 50.3 °C was set in August 2021.24 In 2024 the mean annual temperature reached 21.5 °C for the first time, 1.6 °C above the 1991–2020 average.25 August 2026 was the hottest August on record since 1950.26
The same reanalysis gives a mean temperature of 20.3 °C for 1991–2020 and a warming of about 0.48 °C a decade over 1971–2022. Station records and national reports use other sources and periods, so their warming rates can differ (the text cites 0.46 °C a decade over 1971–2020 in the World Bank profile).
Annual rainfall, 1950 to 2022
Country average, mm
Annual mean temperature, 1950 to 2022
Country average, °C
Projections
Under a high-emissions pathway (SSP3-7.0), days above 35 °C rise from 57 a year to 84 by 2040–2059.23 Rainfall is projected to fall by 7.9% over the same period, most in the rainier north-west. Rainfall events now expected once a century are projected to become 20% more frequent by 2050.23 Sea level is projected to rise by 0.23 m by 2050 and 0.68 m by 2100.23 Tunisia’s updated climate pledge rates 440 km of coastline, 26.6% of the total, as very highly vulnerable to marine submersion and erosion.27
Projected change for Tunisia
The table gives the CMIP6 multi-model median from the same World Bank portal, as change against 1995–2014. Projections cited in the text may use other models, scenarios or baselines, so their figures can differ.
| Scenario | Temperature, 2040–2059 | Rainfall, 2040–2059 | Temperature, 2080–2099 | Rainfall, 2080–2099 |
|---|---|---|---|---|
| Middle of the road (SSP2-4.5) | +1.6 °C | −8% | +2.5 °C | −14% |
| High emissions (SSP5-8.5) | +2.1 °C | −14% | +5.1 °C | −25% |
Sources and notes
Source: World Bank Climate Change Knowledge Portal, retrieved September 2026. ERA5 0.25° reanalysis for the annual series (1950–2022) and the monthly climatology (1991–2020); CMIP6 0.25° multi-model ensemble median for the projections, as change against 1995–2014. These are national averages, which hide the gap between wet highlands and dry interiors, and reanalysis rainfall over deserts carries wide uncertainty.
Water resources
Dams capture the north's surface water, interconnected by canals to supply Tunis and the Sahel. Southern groundwater, much of it fossil, irrigates the date-palm oases and is overdrawn there; the centre draws on deep and shallow aquifers of medium to poor quality.1 Treated wastewater, reused in Tunisia since 1965, irrigates fodder, fruit trees and golf courses.28 29 Uneven effluent quality and unreliable supply limit uptake.29 Desalination, long established at brackish-water plants in Kerkennah, Gabès, Zarzis and Djerba, is now expanding along the eastern coast.1 4 30 5
The Medjerda is Tunisia’s only perennial river, and the northern basins supply 82% of the country’s surface water.1 In 2011 dams supplied 35% of the water, deep groundwater 40% and shallow wells 22%, in FAO’s 2015 profile; AQUASTAT’s split for 2023 is charted below. Surface withdrawals swing with the rain, from 3,785 million m³ in 2004–05 to 1,151 million m³ in 2010–11.1 Dam storage and its swings through the drought are covered under Infrastructure.
Aquifers under strain
Of 273 identified aquifers, 71 are overexploited, with use nearly 50% above renewal.17 Shallow aquifers yielded 807 million m³ in 2007, against a potential of 745 million m³.1 Counting illegal wells, the Court of Audit put groundwater use at 126% of available reserves.7 In the Saharan oases of Nefzaoua, deep fossil aquifers have been used intensively for farming.31 Around Kebili the Continental Intercalaire has been heavily overexploited since 2000.32 On Cap Bon, a model study found that overexploitation since 1965 has induced a seawater inflow of about 5.15 million m³ a year into the Korba aquifer.33 At Korba, monitoring from 2006 to 2020 found a 5 m depression in the water table 4 km from the shore.34
Supply by source
On the supply side, the largest source is groundwater, about 83% of the total, with the balance from surface water (16%), treated wastewater, direct use (under 1%), desalination (under 1%), according to FAO AQUASTAT’s figures for water withdrawal by source (2023)20.
Where the water comes from
Supply mix, MCM per year
The main river
The main river of Tunisia in the dataset is the Medjerda, which also flows through Algeria. It runs 303 km in Tunisia; its modelled natural flow, the long-term average before any withdrawals, reaches 75 m³/s inside the country, and 0% of that length is still classed as free-flowing.
The dams on it, from the FAO AQUASTAT inventory, are listed river by river under Infrastructure.
Sources and notes
Sources: Grill, Lehner, Thieme et al. (2019), Mapping the world’s free-flowing rivers, Nature 569, dataset under CC BY 4.0, for length, natural flow (WaterGAP, 1971–2000) and free-flowing status, meaning the share of the river’s length inside Tunisia still classed as free-flowing. No flow figure is given below 20 m³/s, where a global model is too coarse to rank small rivers. The same river is drawn on the water map above under Rivers & lakes.
Water use
Tunisia already uses almost all the water it can capture. It mobilised 92% of its renewable resources in 2018.2 Withdrawals rose from 2,640 million m³ in 2000 to 2,971 million m³ in 2007–08, and reached 3,305 million m³ in 2011.1 In 2010 agriculture took 80%, municipalities 14%, industry 5% and tourism 1%.1
From springs to drip
About 65,000 ha were irrigated at independence in 1956, mostly from springs and artesian wells.1 Major works on the lower Medjerda were completed in 1960 and at Nebhana in 1970.13 Equipped land reached 385,000 ha in 1991 and 459,570 ha in 2011. Private farmers equipped 216,400 ha of that, 150,000 ha of it on shallow groundwater.1 Irrigated farming produced about 37% of agricultural output on 8% of farmland in 2018.2
A national water-saving strategy began subsidising efficient irrigation in 1995, with support stepped up from 2006. Drip and other localised systems spread from 6,000 ha in 1991 to 62,000 ha in 2001 and 155,000 ha in 2012.1 Much public equipment has aged. The Court of Audit, in its report published in 2021, found about 61% of the equipment of irrigated areas covering 156,160 ha obsolete and more than 25 years old. It put water losses in the networks that convey and distribute irrigation water at 43% of all the water conveyed and distributed between 2013 and October 2019, a figure that includes losses within farms.35
The long drought
In late March 2023, as the reservoirs ran low (see Infrastructure), SONEDE, the water utility, began cutting supply every night from 9pm to 4am. Using drinking water on farmland, green spaces and cars was banned.3 The 2023 grain crop was forecast at 200,000–250,000 tonnes, against 750,000 tonnes in 2022.36 The Tunisian Water Observatory recorded 2,153 unannounced cuts and 186 water protests in 2024.7
Use by sector
Agriculture is the largest user of water in Tunisia, at roughly 75% of total water withdrawal; the full split is agriculture (75%), municipal (23%), industry (2%), in FAO AQUASTAT’s figures for total water withdrawal (2023)20.
Withdrawals by sector
Million m³ a year, FAO AQUASTAT, 2023
- Agriculture2,885 MCM · 75%
- Municipal883 MCM · 23%
- Industry80 MCM · 2%
Withdrawals over time
The World Bank series charted below carries FAO AQUASTAT’s estimate of Tunisia’s freshwater withdrawals at 1,070 million m³ in 1975 and 3,864 million m³ in 2020; AQUASTAT’s newer estimate is 3,822 million m³ in 2023. Agriculture’s share of total withdrawals fell from 86% in 1994 to 76% in 2020 in the World Bank series; AQUASTAT’s 2023 share is in the split above.20
Freshwater withdrawals, 1975 to 2022
Total, million m³ a year
Sources and notes
Source: FAO AQUASTAT via the World Bank World Development Indicators, retrieved September 2026. AQUASTAT revises national figures irregularly and fills the years between surveys, so a jump between two adjacent years usually marks a new national estimate rather than a change on the ground. The World Bank series carries AQUASTAT’s 2020 estimate of Tunisia’s freshwater withdrawals forward unchanged to 2022. The irrigated-area tile gives the ministry’s figure: irrigated perimeters “do not much exceed 8%” of the utilised agricultural area (superficie agricole utile), as the press reported the ministry’s 2024 national water report.38 The ministry’s 2017 report gives the same 8% of the utilised agricultural area. The World Bank’s copy of the FAO AQUASTAT series, agricultural irrigated land as a share of total agricultural land, gives 3.9% for 2013; the two figures use different denominators. Water stress (SDG 6.4.2): FAO, the custodian agency for the indicator. FAO. 2026. AQUASTAT Core Database. Food and Agriculture Organization of the United Nations. Database accessed on 2026/10/20.37 FAO gives 97% for 2023, flagged E: an estimate calculated or identified from official values or from an AQUASTAT estimation, in FAO’s definition. The withdrawal behind FAO’s value is 3,822 million m³ for 2023 (flag A); the World Bank series charted here shows 3,864 million m³ for 2022.
Water for farming
The ministry counts irrigated perimeters of about 445,000 ha in 2025: 253,000 ha of public perimeters and, on its earlier estimates, around 192,000 ha of private ones, irrigated mainly with groundwater.39 Of the public perimeters, 157,000 ha are served by large dams, 82,280 ha by groundwater, mostly in the south and centre, 5,900 ha by hillside dams and lakes and 1,179 ha by treated wastewater.39 In 2025 the agriculture quota from the dams was 70 million m³, of which almost 48 million m³ was used.39 Agriculture takes about 86% of the 3,217 million m³ of groundwater withdrawn in 2024, a rate of exploitation of 133%, with about 827 million m³ from unauthorised boreholes.39 The national supply mix is under Water resources, and the equipped area since independence under Water use.
Sources and notes
Sources: the Ministry of Agriculture, Water Resources and Fisheries (MARHP) national water-sector reports for 2024 and 2025, published by the national agriculture observatory (ONAGRI); the World Bank implementation status report for the Irrigated Agriculture Intensification Project (June 2026), its restructuring paper (August 2023) and its completion report for the Northern Tunis Wastewater Project (December 2021); the World Bank’s 2018 study of drought in Tunisian agriculture; FAO AQUASTAT; Ecofin Agency; and Mayaux and Ennabih (2023). The shares in the table are calculated here from the ministry’s areas. FAO’s database gives a different picture of the same sector: 481,500 ha equipped for irrigation in 2023, 451,500 ha of it under full control, with 241,000 ha localised, 114,700 sprinkler and 95,800 surface (all official values), against the ministry’s 442,500 ha for 2023. The two come from different definitions or sources; the sources read do not reconcile them and they should not be set on one chart. FAO’s share of equipped area on groundwater (76%) is not used here. The 2025 ministry report is not always consistent with itself. The areas by source of water for public perimeters (157,000 ha from large dams, 5,900 ha from hillside dams and lakes, 82,280 ha from groundwater and 1,179 ha from treated wastewater) add up to 246,359 ha, not the 253,000 ha it gives for the public perimeters, and its 1,179 ha for treated wastewater differs from the 7,819 ha it gives as equipped for that water; it also gives the 2023/24 reuse volume as 11.1 million m³ in one place and 11.3 in two others. The report states that about 41,400 ha of public perimeters are being rehabilitated in one place and 43,000 ha in another; neither is used here. The Bank’s 62% efficiency figure comes from the two schemes that had completed modernisation (Testour and Mateur) in the May–October 2025 season, not from the whole project area. The ministry’s 4.4 million m³ (2024/25) is water distributed to irrigated perimeters; the 64.9 million m³ reused in 2024 is a wider measure that includes other uses and aquifer recharge, and the two are kept apart. The ministry’s 133% rate of groundwater exploitation is for 2024. The 1994 order on crops is described in the 2023 Zaouiet Sousse paper; whether it has been amended since, that paper does not say. The financing of the TANIT project is described in the ministry’s report as approved at about EUR 250 million of credit, with the financing agreement under negotiation; Ecofin Agency’s 11,500 ha is from local media reports of the launch, and neither was checked against a project document. The report covers show the year of each national report but no issue date. Moved here from the text: FAO’s count of equipped area is larger than the ministry’s; the ministry counts 36 perimeters in 15 governorates equipped for treated wastewater, and irrigation with it took 19.3 million m³ in 2022; in 2025 the dams delivered about 420 million m³ in the northern system, of which the drinking-water utility took almost 407 million m³ and the irrigated perimeters 13 million m³39; the World Bank reported in 2018 that water-saving equipment was subsidised at 40–60%, depending on farm size;40 the public operator meant to take over the management of public perimeters from the regional agricultural commissions and the user groups was still unestablished in the Bank’s 2023 restructuring paper;41 under the Eau 2050 strategy the ministry lists modernising 40,000 ha of public perimeters and a cropping intensity of 130%;39 FAO’s estimates for 2023 for treated wastewater in irrigation are 8,000 ha and 19.2 million m³;42 the Bank’s completion report on the Northern Tunis project found 4.8 million m³ a year reused at Borj Touil against a target of 11 million, with less than a third of 3,145 ha irrigated before the project because of farmers’ reluctance and ageing infrastructure.43
Methods and programmes
Water-saving equipment covered 428,500 ha in 2024, or 96.9% of irrigated perimeters; the national programme has invested 1,727 million dinars since 1995, 782.5 million of it as subsidies to farmers.44 39
| Method | Area, 2024 (ha) | Share of irrigated perimeters |
|---|---|---|
| Localised (drip) | 219,900 | 50% |
| Sprinkler | 113,900 | 26% |
| Improved surface (gravity) irrigation | 94,700 | 21% |
| Total with water-saving equipment | 428,500 | of 442,500 ha44 |
The Bank-financed Irrigated Agriculture Intensification Project, which was due to close on 30 June 2026, reported 16,832 ha with new or improved irrigation services on 5 June 2026 against a target of 24,371 ha, 69%, and efficiency of 62% in the two schemes that had finished modernising.45 Of 1,318 user groups for public irrigation perimeters in 2025, 46% had a signed management contract with the regional commission and 16% an audited financial report.39 In 2025 the commissions charged the groups 47 to 205 millimes per m³, and the directorate-general put average cost recovery at 79%.39 The Bank approved a follow-on project of US$124 million in March 2026 for four northern governorates.46 Governance and the draft Water Code are under Governance & institutions.
Treated wastewater
The ministry counts 7,819 ha of perimeters equipped for treated wastewater in 2025, of which 1,817 ha were irrigated. Irrigation took 4.4 million m³ in 2024/25, against 11.3 million in 2023/24.39 It put the fall down to poorer effluent: 15 plants feeding perimeters had salmonella or non-cholera vibrios and irrigation stopped.39 Wider reuse of all kinds reached 64.9 million m³ in 2024, about 22% of treated wastewater.39 Tunisian rules since 1994 limit treated wastewater to industrial and fodder crops, forests and fruit trees, and bar crops eaten raw.29 The TANIT project, launched with Italy on 3 November 2025, is to bring treated water from five plants to farms of the state land office, about 11,500 ha in all; the ministry reports that financing is approved and the agreement still under negotiation.47 39 The ministry says reuse in irrigation remains far below the goals of its Eau 2050 plan, which sees treated water irrigating about 40,000 ha by 2050.39 Plants are under Infrastructure; reuse and irrigation projects across the region are on the Agriculture & Food hub.
Infrastructure
The dams directorate’s bulletin of 1 September 2025 lists 36 dams with an initial capacity of 3,021 million m³.6 Silt has cut that to 2,368 million m³, and the loss grows by about 13 million m³ a year.6 Sidi Salem, on the Medjerda, is the largest. A 1977 World Bank loan partly financed it and the canal to Cap Bon, to supply Greater Tunis and the Sahel.13 It entered service in 1981 with an initial capacity of 814 million m³; by the 2018 survey, silt had taken 28.7% of it.14 Sidi El Barrak, finished in 1999, holds 286.5 million m³.6 The old Mellègue dam shows the problem at its worst, with 81% of its capacity lost to silt.6
Tracked projects
| Asset class | Projects | Disclosed value | Largest by value |
|---|---|---|---|
| Desalination | 9 | US$ 626 m | Sfax Seawater Desalination |
| Wastewater and reuse | 10 | US$ 448 m | ONAS Southern Sanitation Concession |
| Conveyance, storage and dams | 13 | US$ 240 m | Mellègue Supérieur Dam |
| Networks and other | 2 | – | – |
Open the project database for Tunisia
Storage through the drought
Dam storage fell in steps through a run of dry years. On 1 September it stood at 64% in 2019, 44% in 2020, 33% in 2021 and 23% in 2024.14 Sidi Salem, which serves Tunis, was 16.7% full on 28 March 2023.14
Water in Tunisia's dams, 1 September
Total stored volume, million m³ (DGBGTH bulletins via ONAGRI)
Rain returned in 2025–26. Northern dams were close to 68% full in April 2026, and national storage reached about 60% in June.8 18 Central dams such as Nebhana still had no inflows.18
New dams and transfers
The Upper Mellègue dam in Le Kef was about 90% complete in August 2026, with around 200 million m³ of storage and a cost of TND 276 million.48 The 45 million m³ Douimis dam near Bizerte is to feed the Sejnane reservoir in the northern transfer system by the end of 2026.48 In February 2025 a ministerial council ordered work finished on four dams and reservoirs holding 318 million m³ in total.49 SONEDE also plans about 28 km of large mains, financed by an AFD loan, to secure transfers of northern water to Cap Bon, the Sahel and Sfax.15
| Conveyors and transfers in the register | Length (km) | Flow as stated | Status | Award or start | Commissioned |
|---|---|---|---|---|---|
| Canal Médjerda-Cap Bon | 120 | 16 m³/s | Operating | 1984 | 1984 |
| Northern Waters Transfer to the Sahel and Sfax | about 28 (mains) | treatment complex of 4 m³/s | Planned | 2024 | – |
Register records only, not a complete national inventory.
Sources and notes
Source: the MENA Water Review major projects register. Ranked by length in km as each record states it; a figure the record gives only in another unit is shown as written and not ranked. Each name links to the project record and its sources.
Desalination
SONEDE built its first desalination plant in 1983.50 Seawater plants now anchor supply in the south and east. Djerba’s 50,000 m³/day plant opened in 2018, and a plant of the same size at Zarat, near Gabès, followed in 2024.51 30 The Sfax plant, built for 100,000 m³/day and expandable to 250,000, started its first unit in July 2024 and reached full output in September 2024.4 Its updated estimated cost is about TND 1.18 billion,52 including a JICA loan of about TND 800 million.53 A 50,000 m³/day plant at Sousse, paid for from the state budget and linked to the Northern Waters system, entered service in September 2026.54 5
| Largest desalination plants in the register | Capacity (m³/day) | Status | Award or start | Commissioned |
|---|---|---|---|---|
| Sfax Seawater Desalination | 100,000 | Operating | 2021 | 2024 |
| Zarat Desalination | 50,000 | Operating | 2019 | 2024 |
| Djerba Desalination | 50,000 | Operating | 2018 | 2018 |
| Sousse Seawater Desalination | 50,000 | Operating | – | 2026 |
| Gabès Brackish Water Desalination | 34,000 | Operating | 1995 | 1995 |
| Zarzis Brackish Water Desalination | 15,000 | Operating | 1999 | 1999 |
| Gafsa Brackish Water Desalination | 12,000 | Under construction | 2019 | – |
| Kerkennah Brackish Water Desalination | 3,300 | Operating | 1983 | 1983 |
| Ben Gardane Brackish Water Desalination | 1,800 | Operating | 2013 | 2013 |
Register records only, not a complete national inventory.
Sources and notes
Source: the MENA Water Review major projects register. Ranked by capacity in m³ a day as each record states it; a figure the record gives only in another unit is shown as written and not ranked. Each name links to the project record and its sources.
Networks and sanitation
SONEDE distributes water through 48,241 km of pipes and 1,412 reservoirs, and it supplied 667.9 million m³ in 2023.55 Rural coverage reached 95.5% in 2022: 54.1% of rural people were supplied by SONEDE and 41.3% by the Génie Rural, the rural engineering service.56 Estimates of drinking-water network losses range from about a quarter to about half: the coordinator of the Tunisian Water Observatory puts them at about 25% of the country’s potable water,7 and one expert put them at about 50% of SONEDE’s water in March 2026.57 The Eau 2050 strategy aims to raise the efficiency of drinking-water and irrigation networks together from 67% to 85% by 2050.7 For public irrigation networks alone, the ministry’s 2025 water report gives an average efficiency of about 60% and an aim of 80%.39 ONAS runs 127 treatment plants and 18,437 km of sewers, and it treated 295.7 million m³ in 2024.58 Of 287 million m³ treated in 2020, 21 million m³ were reused directly and 41 million m³ indirectly, and that year 24% of the treatment plants ran above hydraulic capacity. ONAS served about 63% of the population when the World Bank appraised its 2022 project, which lends €113.6 million to bring private operators into plants in northern Tunis and the south-east. Only 9,500 of the 487,000 hectares equipped for irrigation it counts can be irrigated directly with treated wastewater.59 Electricity is a weak link. In summer 2026, rotating power cuts stopped electric pumping stations and disrupted water distribution.24
| Largest wastewater treatment plants in the register | Capacity (m³/day) | Status | Award or start | Commissioned |
|---|---|---|---|---|
| Choutrana Wastewater Plant | 119,000 | Operating | 1986 | 1986 |
| Sfax Sud Wastewater Plant | 49,500 | Operating | 1983 | 1983 |
| Sud Méliane I Wastewater Plant | 37,500 | Operating | 1982 | 1982 |
| Sousse Hamdoun Wastewater Plant | 31,216 | Operating | 2018 | 2018 |
| Bizerte Wastewater Plant | 26,600 | Operating | 1997 | 1997 |
| Sfax Nord Wastewater Plant | 17,900 | Operating | 2004 | 2004 |
Register records only, not a complete national inventory.
Sources and notes
Source: the MENA Water Review major projects register. Ranked by capacity in m³ a day as each record states it; a figure the record gives only in another unit is shown as written and not ranked. Each name links to the project record and its sources.
Dams and reservoirs
| Largest dams in the FAO AQUASTAT inventory | River | Completed | Storage (million m³) |
|---|---|---|---|
| Sidi Salem | Medjerda | 1981 | 814 |
| Sidi El Barrak | – | 1999 | 286.5 |
| Mellègue (Nebeur) | Mellègue | 1954 | 268 |
| Sidi Saad | Zeroud | 1981 | 209 |
| Bou Heurtma | Bou Heurtma | 1976 | 150.5 |
| Sejnane | Sejnane | 1990 | 137.5 |
| Main river | Dams in the inventory · storage | Largest reservoir |
|---|---|---|
| Medjerda | 3 · 823.7 MCM | Sidi Salem (1981), 814 MCM |
Sources and notes
Sources: FAO AQUASTAT regional dam inventories (CC BY 4.0), which list large dams with a published capacity and can lag recent construction; the MENA Water Review major projects register, where each record cites its source on the project page. The database follows large contracted projects, not the whole asset base. Dam capacities are shown to one decimal where the record has a fraction. In the table by river, a dam is counted against the river its inventory record names, with French, Arabic, Persian and Turkish spellings of the same river treated as one; a record that gives no river is matched by its coordinates to the nearest river reach, so an unnamed dam on a tributary close to a main stem can be counted against the main stem. Records that give neither a river nor usable coordinates cannot be matched, so some rivers show fewer dams than they have. The rivers are the main rivers given under Water resources. For Tunisia, the capacities of Sidi Salem, Sidi El Barrak, Mellègue (Nebeur), Bou Heurtma, Sejnane and Bir M’cherga and the completion year of Sidi El Barrak follow the dams directorate’s bulletin of 1 September 2025 (initial capacity).6
Water quality
Rising salinity in coastal aquifers is Tunisia’s main water-quality problem, driven by irrigation demand and seawater intrusion.1 On Cap Bon, seawater contamination forced farmers to abandon plots and wells.16 In the Sidi Bouzid basin, 76% of groundwater samples exceeded 30 mg/L of nitrate.60 Near Kebili, oil and brine have contaminated wells, and one well carries water at 20 g/L of salt.32
River water turns saltier in summer. In the lower Medjerda, a World Bank appraisal of 1982 reported salt content of 1–1.5 g/L in winter and 3–3.5 g/L in summer.13 Monthly monitoring at 12 sites during 2013 linked salinity to intensive farming, and ammonium, phosphate and organic load to urban sites.61 In 2022 only 19% of Tunisians said they were satisfied with the quality of water in their city or area, according to a Gallup poll.16
Wastewater
In 2020, 27% of the effluent of ONAS, the sanitation office, did not conform to standards. In the two areas of the World Bank’s 2022 project (see Infrastructure), northern Tunis and the south-east, 71% of plants failed to meet discharge standards consistently in 2019.59
Gabès
The phosphate complex at Gabès is the main pollution source in its gulf, because most of its waste goes straight to sea untreated.62 About a hundred million tonnes of untreated phosphogypsum have been discharged since the complex was built.63 Seawater near the plant is strongly to seriously affected.64 The plant opened in 1972, and a 2017 government pledge to phase it out was not carried out.65 In October 2025 a general strike shut the city after more than 200 people were hospitalised with breathing problems.65 About 2,500 people marched again in December.66 President Saied received a working group’s final report in January 2026 and visited Gabès in August.67
The reported indicators
Drinking water services
Share of the population, %
On the latest values each country reports for SDG indicator 6.3.1, Tunisia’s 76% (2024) ranks joint 7th of the 17 countries covered here that report it; years differ by country. The regional comparison is in the wastewater and reuse dashboard.
Sources and notes
Sources: WHO/UNICEF Joint Monitoring Programme via the World Bank; SDG 6.3.1 and 6.3.2 from the UN Statistics Division SDG database, retrieved September 2026. Safely managed drinking water means an improved source on the premises, available when needed and free from faecal and priority chemical contamination. SDG 6.3.2 rests on each country’s own monitoring network, so a high share can mean few water bodies were assessed, and values move when methods change between reporting rounds.
Governance & institutions
Water resources, irrigation and drinking water are overseen by the Ministry of Agriculture, Water Resources and Fisheries; sanitation is overseen by the Ministry of Environment.59 The agriculture ministry’s directorates-general assess resources, build and run large dams, manage irrigation and rural drinking water, and protect watersheds.1 In each governorate, a regional agricultural development commission manages water resources and public irrigation schemes.1 SONEDE, created in 1968, supplies drinking water.50 ONAS, created in 1974, runs sanitation.73 More than 2,800 user groups managed small schemes in 2009, and a consultative National Water Council has advised the ministry since 2010.1
A water code still in revision
The Water Code dates from 1975 and was amended in 1987, 1988 and 2001.1 A 2015 attempt at a new code met trade-union resistance over fears of privatisation.16 A parliamentary committee adopted draft law 66/2019 in June 2021. It would have handed rural water to SONEDE and ended the user-group system.74 A redraft went to the prime minister’s office in January 2023.75 In February 2025 the government ordered a final version, and by April 2026 the code was still under revision.49 8 The Eau 2050 strategy aims to cut agriculture’s share of water from 80% to 70%; its network-efficiency target is under Infrastructure.7
Tariffs and private operators
Drinking-water tariffs follow one national scale of six quarterly bands, set by ministerial order.76 Under a five-year plan to rescue SONEDE’s finances, prices rise by about 150 millimes a year. The fourth increase came in March 2024, while the lowest band stayed at 200 millimes per m³.77 Irrigation tariffs were frozen from 2002 and covered only 50–60% of operating costs in 2018.2 A ministry circular of March 2021 provided for annual increases, and in 2025 the regional agricultural commissions charged water user groups 47 to 205 millimes per m³, with average cost recovery put at 79%.39 ONAS has used private operators since a 1997 pilot on 185 km of Greater Tunis sewers. Under the 2008 concessions law and the 2015 PPP law, its new concession contracts run for ten years.59
Key sector institutions
- Ministry of Agriculture, Water Resources & FisheriesLead ministry
Lead ministry for water resources, irrigation and the national water strategy.
agriculture.tn (website, opens in a new tab) - SONEDENational potable-water utility
National potable-water utility: production, treatment and distribution.
sonede.com.tn (website, opens in a new tab) - ONASNational sanitation utility
National sanitation utility for wastewater collection, treatment and reuse.
onas.nat.tn (website, opens in a new tab) - DG Rural Engineering & Water Exploitation (DGGREE)Irrigation
Directorate-general of the agriculture ministry for irrigation schemes and rural drinking water.
agriculture.tn (website, opens in a new tab) - DG Water Resources (DGRE)Resource assessment
Directorate-general of the agriculture ministry that assesses and monitors surface and groundwater resources.
agriculture.tn (website, opens in a new tab)
Sources and notes
Institutions compiled from the FAO AQUASTAT institutions database and national sources. Responsibility lines summarise this report and the organisations directory. Website links are the official sites verified for that directory; for a group of bodies, the link is one member’s site.
Challenges & outlook
Tunisia’s water future rides on its fiscal one. The next drought will test three weak points at once: dams losing capacity to silt, networks losing water to leaks, and a power grid that can stop the pumps.6 57 24 Desalination at Djerba, Zarat, Sfax and Sousse eases the coast, but the northern dam system still decides whether Tunis faces rationing again.
The institutional agenda is overdue. A new Water Code has been in draft since 2019,8 and the Eau 2050 strategy comprises 43 programmes and about 1,200 measures.78 The projections under Geography & climate point to less rain in the wetter north-west and more frequent extreme rainfall.23
Sources
78 references
Principal sources: BPEH/Ministry of Agriculture; SONEDE and ONAS; observatoire data on dam levels; FAO AQUASTAT. Figures approximate.
- FAO (2015), Profil de pays AQUASTAT: Tunisie.
- World Bank (2018), project information document, Tunisia Irrigated Agriculture Intensification Project (P160245).
- Al Jazeera, report on overnight water cuts in Tunisia, 31 March 2023.
- SONEDE, Sfax seawater desalination plant.
- Business News, “Sousse : après huit ans d’attente et plusieurs reports, la station de dessalement entre enfin en service”, 6 October 2026.
- DGBGTH via ONAGRI, situation hydraulique des barrages, 1 September 2025.
- Carnegie Sada, “Securing Tunisia’s constitutional right to water: policy solutions”, 28 February 2025.
- Zawya (TAP), report on improved dam filling rates in Tunisia, April 2026.
- UNESCO World Heritage Centre, Le complexe hydraulique romain de Zaghouan-Carthage, Tentative List, submitted by Tunisia in 2012 (archived copy).
- Austrian Academy of Sciences, Austrian Archaeological Institute, “The Roman hydraulic complex between Zaghouan and Carthage”, research project with Tunisia’s Institut National du Patrimoine (archived copy).
- UNESCO World Heritage Centre, Kairouan, inscribed 1988 (archived copy).
- Agence de mise en valeur du patrimoine et de promotion culturelle (AMVPPC), Ministry of Cultural Affairs, Basins of the Aghlabids, Kairouan.
- World Bank (1982), staff appraisal report, Medjerda–Nebhana Irrigation Development Project.
- ONAGRI and DGBGTH, daily dam situation bulletins (1 September 2016 to 1 September 2025; 28 March 2023).
- SONEDE, securing the northern water transfers to the Sahel and Sfax (archived).
- Carnegie Endowment, “What Tunisia’s municipalities can contribute to climate adaptation”, 13 June 2024.
- World Bank (2018), Climate Variability, Drought, and Drought Management in Tunisia’s Agricultural Sector.
- WebManagerCenter (TAP), report on dam filling at 60%, 23 June 2026.
- World Bank, World Development Indicators and country water-sector reporting. data.worldbank.org.
- FAO, AQUASTAT — Global Information System on Water and Agriculture: country water resources, withdrawals by sector and dam register. fao.org/aquastat. Latest country values as compiled at build.
- World Resources Institute, Aqueduct 4.0 Water Risk Atlas (2023) — the sub-basin risk, stress and groundwater-decline layers on the interactive maps. wri.org/aqueduct. Country baseline water-stress category: Aqueduct 4.0 Current and Future Country Rankings (16 August 2023), indicator bws, all sectors, 1979–2019.
- White, C. (2014), “Understanding water scarcity: definitions and measurements”, in Grafton, Wyrwoll, White and Allendes (eds), Global Water: Issues and Insights, ANU Press, p. 161, giving the Falkenmark et al. (1989) thresholds.
- World Bank Group (2025), Climate Risk Country Profile: Tunisia (archived).
- Al Jazeera, “Tunisia swelters as power cuts disrupt water supplies”, 31 August 2026.
- Institut National de la Météorologie, bilan climatique de l’année 2024.
- Institut National de la Météorologie, bulletin climatique préliminaire, août 2026.
- Republic of Tunisia, updated Nationally Determined Contribution (2022).
- ONAS, la réutilisation des eaux usées traitées.
- Mayaux and Ennabih (2023), Water Alternatives 16(2), on treated-wastewater reuse in Tunisia.
- SONEDE, Zarat seawater desalination plant.
- Mekki et al. (2013), Journal of Environmental Management, doi:10.1016/j.jenvman.2013.02.041.
- Besser and Hamed (2019), Environmental Pollution, doi:10.1016/j.envpol.2019.07.020.
- Zghibi et al. (2019), Environmental Monitoring and Assessment, doi:10.1007/s10661-019-7866-5.
- Slama et al. (2022), Marine Pollution Bulletin, doi:10.1016/j.marpolbul.2022.113914.
- Cour des comptes (Court of Audit), Tunisia, 32nd General Annual Report (in Arabic), February 2021, chapter on the management of irrigation water, pp. 366 and 388.
- The Guardian, report on Tunisia’s water ban, 5 April 2023.
- FAO. 2026. AQUASTAT Core Database. Food and Agriculture Organization of the United Nations. Database accessed on 2026/10/20. Variable “SDG 6.4.2. Water Stress” (indicator 6.4.2, level of water stress: freshwater withdrawal as a proportion of available freshwater resources; FAO is the custodian agency), read from the AQUASTAT Dissemination System.
- WebManagerCenter with TAP (20 October 2025), report on the ministry’s national water report for 2024.
- Tunisian Ministry of Agriculture, Water Resources and Fisheries, Rapport national du secteur de l’eau, année 2025 (ONAGRI).
- World Bank (2018), Climate Variability, Drought, and Drought Management in Tunisia’s Agricultural Sector, box 0.1.
- World Bank (31 August 2023), restructuring paper, Tunisia Irrigated Agriculture Intensification Project (P160245).
- FAO. 2026. AQUASTAT Core Database. Food and Agriculture Organization of the United Nations. Database accessed on 2026/10/20. Values for the variables named in the text, read from the AQUASTAT Dissemination System with FAO’s flag on each: official value, estimate (calculated or identified from official values or from an AQUASTAT estimation) or imputed (carried forward or interpolated).
- World Bank (2021), Implementation Completion and Results Report, Tunisia Northern Tunis Wastewater Project (P117082).
- Tunisian Ministry of Agriculture, Water Resources and Fisheries, Rapport national du secteur de l’eau, année 2024 (ONAGRI).
- World Bank (29 June 2026), Implementation Status & Results Report, Tunisia Irrigated Agriculture Intensification Project (P160245).
- World Bank (1 April 2026), press release: Tunisia, Major Push to Strengthen Water Security and Resilience.
- Ecofin Agency (November 2025), Tunisia, Italy Launch TANIT Project to Reuse Wastewater for Farming, citing ONAS data.
- WebManagerCenter, report on new dams under construction, 7 August 2026.
- WebManagerCenter, “Tunisie : vers un Code des eaux révisé et une gouvernance optimisée des ressources en eau”, 26 February 2025.
- SONEDE, Historique.
- SONEDE, Djerba seawater desalination plant.
- African Manager, inauguration of the Sfax desalination plant, 23 June 2026.
- Embassy of Japan in Tunisia, on the Japanese yen loan for the Sfax desalination plant.
- SONEDE, Sousse seawater desalination plant.
- SONEDE, home page, key figures.
- SONEDE, rural supply strategy.
- Webdo, “50% de l’eau de la SONEDE perdue, selon cet expert”, 23 March 2026.
- ONAS, ONAS en chiffres.
- World Bank (2022), project appraisal document, Tunisia Sanitation PPP Support Project (P162957).
- Ncibi et al. (2023), Environmental Science and Pollution Research, doi:10.1007/s11356-022-25016-y.
- Slimani et al. (2020), Environmental Science and Pollution Research, doi:10.1007/s11356-020-09326-7.
- El Kateb et al. (2018), PLoS One, doi:10.1371/journal.pone.0197731.
- El Zrelli et al. (2018), Environmental Science and Pollution Research, doi:10.1007/s11356-018-1648-4.
- El Zrelli et al. (2018), Marine Pollution Bulletin, doi:10.1016/j.marpolbul.2017.12.012.
- Al Jazeera, report on the general strike in Gabès, 21 October 2025.
- Reuters via Cyprus Mail, report on renewed Gabès protests, 17 December 2025.
- TAP via allAfrica, report on the presidential visit to Gabès, August 2026.
- IUCN, BRIDGE water-diplomacy dialogues on the Medjerda, 5 May 2025.
- FAO (2016), AQUASTAT country profile: Libya.
- Almulla et al. (2020), Sustainability 12(17): 7043, doi:10.3390/su12177043.
- Elliot et al. (2014), Journal of Environmental Radioactivity, doi:10.1016/j.jenvrad.2014.07.003.
- Libya Observer, report on Tunisia’s ratification of the groundwater consultation agreement, 12 January 2025.
- ONAS, home page.
- WebManagerCenter (TAP), report on the committee adoption of the draft water code, 19 June 2021.
- WebManagerCenter (TAP), “Le nouveau code des eaux sur le bureau de Najla Bouden”, 23 January 2023.
- SONEDE, la facture d’eau.
- WebManagerCenter (TAP), report on SONEDE’s tariff increases, 5 April 2024.
- La Presse de Tunisie, “Gestion de l’eau : cap sur 2050 avec 74 milliards de dinars d’investissements”, 9 June 2026.
Numbered references are linked from the superscript markers in the text. Figures without a marker come from the sources above as compiled in the site methodology.